VicenzaGuide rail lifting cargo elevatorWhat is the factory way

announcer:hp779HP136589660 release time:2024-01-13 13:33:47

Nowadays, small and medium-sized enterprises are products with the idea of good quality and preferential prices.

Carefully prepare a special construction plan for installation and construction, and provide safety technical disclosure to installation personnel.

Vicenza.In fact, it is also important to pay attention to some details, as follows: It is actually difficult to pierce the bearings into the shaft pins when excessively installing them. However sometimes, some people think of using a hammer to hammer the bearings to facilitate the installation, and use brute force during installation. In fact, which is the main reason for causing bearing damage and reducing the service life of the bearings. So when installing bearings, we must not go too far. Fortunately, we can place some soft cloth or cardboard on top of them before installing them.

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

.When a cargo elevator fails, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.

Goods should be stacked well on the platform, and should not be tilted. When the goods elevator is lifting or lowering beyond the scope of the platform, no one should stand around to watch.


VicenzaGuide rail lifting cargo elevatorWhat is the factory way



When a cargo elevator fails it should be repaired by professional personnel. It is not allowed to modify the cargo elevator without permission.

Many times, when ordering a large lifting platform, after the customer has determined the parameters,VicenzaGuide rail lifting cargo elevator cargo elevator, the designer will first consider various factors before designing, including the size during transportation, to prevent it from being difficult to transport to the customer's installation site after being too wide. Therefore, during design and manufacturing, it is necessary to consider separate assembly or table split to meet the requirements. At the same time it is also necessary to consider the bearing capacity of the split, design and manufacture on the premise of ensuring the load capacity and stability, and ensure that the equipment can be easily transported, lifted, and moved.

The hydraulic lifting platform can be divided into four wheeled mobile type,Vicenza1 ton lifting 8-meter cargo elevator, two wheeled traction type, vehicle modified type, vehicle type, auxiliary self-propelled type, and the lifting height varies from a meter to 1 meter.

Honest management.Test the goods elevator every day to see if it can operate normally.

Low cost: Compared to the scissor type mobile lifting platform, the cost is much lower. Therefore, when purchasing a lifting platform, it is necessary to consider the use range, frequency of work, load, and other factors of the lifting platform to select a lifting platform suitable for the work requirements.

Corrosion prevention measures for the body of aerial work vehicles Attention to small scratches The paint surface of aerial work vehicles often corrodes. In addition to common collisions, scratches, and small rocks on the drive tire, there can also be a paint peeling point that can cause a small rust over time. Because most of these scars are small and easy to ignore. Therefore, regularly inspect the engine compartment lid and surrounding areas, and once found, go to a professional beauty shop for processing in a timely manner.


VicenzaGuide rail lifting cargo elevatorWhat is the factory way



The load of this series of products is divided into 0.1 to 0.8 tons, and can also be customized according to user requirements, with a load of up to 10 tons.

new product.The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure provides stability for the lift. The wide working platform and high bearing capacity make the high-altitude operation range wide and suitable for multiple people to work simultaneously. It makes aerial work efficient and guaranteed.

How to install and use the bearings of the elevator During the process of installing the bearing device of the elevator, we cannot always ensure that the bearing device has the correct orientation, the clearance between the bearings becomes too small, and then the inner and outer rings of the bearings cannot be located at the same rotation center. Therefore,VicenzaFixed lifting cargo elevator, when installing bearings, and in the future, it is also necessary to use a detector to test the bearing device, so as to ensure the success of the bearing device.

After the goods are transported, clean the platform.

Vicenza.Carefully prepare a special construction plan for installation and construction, and provide safety technical disclosure to installation personnel.

Many people believe that the mechanical strength of the elevator itself is relatively high when using the elevator, so the installation method specified in the manual is not strictly followed during the installation process. However, this can lead to increased wear of parts and inflexibility in operation. In addition, it is necessary to pay attention to the installation precautions corresponding to the working environment and not be careless. Correct installation, use, and maintenance of the elevator are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to carefully assemble and use it in strict accordance with the following installation and use related matters.

Prepare the foundation according to the foundation plan, pay attention to alignment, leveling, and alignment and ensure the level of the foundation and various usage requirements.