Asbereni304L stainless steel plateQuality inspection method

announcer:hp535HP136858825 release time:2024-06-11 13:06:18

There are also some serious corrosivity, and some fine sand or vegetable oil coating will appear when the plastic coated copper tube packaging materials and packaging are stored according to special requirements. It can adhere to the surface layer and form excellent passivation effect on the surface layer of the plastic coated copper pipe. When cleaning, a cleaning plan is required. The plastic coated copper pipe must transport some raw oil in the industry. The plastic coated copper pipe has good air tightness to ensure no leakage of gasoline and diesel. It is a good transmission pipeline.

Plastic coated copper pipe is a kind of non-metallic material pipe with light weight, high strength and corrosion resistance. The plastic coated copper pipe is made of glass fiber with resin base weight, which is wound on the rotating hollow floor step by step according to the processing technology regulations, and the stone sand is laid on the ground evenly for a long distance in the middle of the chemical fiber as the intermediate weathering layer. The price quotations of plastic coated copper pipes with different thicknesses are also different. Here, we will explain the factors that determine the thickness of the plastic coated copper pipe design scheme. Appearance and specification of mpp cable duct 1 Color: generally orange red, other colors can be implemented according to the contract of both parties. 2 Appearance quality: The inner and outer walls of the pipe fittings shall be smooth, clean and even, and shall be free of steam bubbles, cracks, cracks, molting, and obvious marks, dents, residues, dissolved discoloration lines and uneven colors. The inner holes of the pipe shall be laser cut and leveled and vertical to the pipe centerline. The inner holes shall be smooth and free of burrs. Specification: The length of pipe fittings is generally 6000 or 9000mm, which can also be negotiated by both parties. The specification error shall conform to dl/t801; The bending degree of the hose shall not exceed 1% of the nominal pressure. Some key points in the process of embedding plastic coated copper pipe: the embedding process of plastic coated copper pipe is very worthy of great attention. Although the actual operation in the process of embedding is relatively simple, there may be many key points. Pay special attention to the leveling and straightness of the road surface when threading, In other words, if the road surface is seriously uneven, it is seriously affected by external forces. Relevant countermeasures must be taken, and fine sand and dirt should also be prohibited from seeping into the pipe during the burial process, so as to diligently maintain its compliance with the regulations during the burial process. The process of embedding the plastic coated copper pipe involves the problem of marking. In fact, the marking that can be carried out according to this marking in the process of maintenance and repair is the key inspection index value of the commodity. If it is found that there is a problem with a certain section of cable, it is only necessary to find matching marks for immediate maintenance. Number of layers of cloth stacking: all layers are made strictly according to the design scheme, without additional construction, which increases the cost. 2 Resin: high temperature resistance, not easy to deform under stress. Plastic coated copper pipes are generally assembled from high-quality SMC water tank plates. Its characteristic is that it can select food grade stainless steel resin. Therefore, in view of the good water body, clean up the natural environment and zero pollution, the commodity development trend has certain characteristics such as high compressive strength, light weight, corrosion resistance, beautiful and generous appearance design scheme, long service life, and more convenient management methods in maintenance. Cloth quality: the specification of cloth surface is the same pure platinum cloth is thick, and it is thick with blended cloth or pure old coarse cloth. The thickness of fiberglass filament winding: our products are high-tech support points of fiberglass anti-corrosion ring, which ensures the bearing pressure of the products. In addition, if you must select the thickened type, you can yze the vertical cross type difficult winding when winding the winding machine, until the thickness and compressive strength of the thickened type are basically achieved.

Asbereni.On the supply side, due to the impact of environmental protection and safety inspection, the output of coke enterprises has decreased. On the demand side, steel mills have reduced their demand for coke due to limited production and the stock of steel mills is basically stable. Recently, the price of coke has dropped. Affected by the rise and fall of buying, steel mills are not enthusiastic about coke purchasing. However, it is understood that the implementation of production restriction by coke enterprises is limited. With the further increase of production restriction by local steel plants, the pressure on coke enterprises to ship continues to increase. It is expected that coke will continue to operate weakly in the short term.

One of the classification of copper tubes. The common wave shape is a single copper tube. Hyperbolic means that two different arcs overlap on the same surface, that is, draw arcs in two radii. The red copper tube is a module made of double curves designed according to the drawings. The red copper tube is light in weight, good in rigidity and high in strength. The shapes of the red copper tubes processed are different and can be processed into various geometric shapes such as arcs and spheres. It is beautiful, elegant and colorful. Let's talk about the two main methods of processing and forming the copper tube: The hot processing and forming method is to roll the copper tube to a roughly hyperbolic shape, then heat it, then place it on the mold prepared in advance, then slowly beat it with a hammer, weld, fold, polish and polish it. The whole process needs to be very careful to ensure the surface quality of the copper tube. This forming method is very suitable for parts with small model and large arc change. When the model size is relatively large and complex, it can be considered to break it into small pieces for forming, and then splice it into large pieces. For such copper pipes the cost is high and the production period is long. 2 Forming method of roll bending This method is to make some modifications on the roll bending machine, and change one of the shafts into a concave type and the other into a convex type. This method can form a regular copper tube like a sphere, with a small processing range but it has great advantages for copper tubes with small radians. What problems should be paid attention to when designing the hyperboloid copper tube? Everyone knows that the design of the air conditioning copper tube is very important. To achieve the beautiful shape, first of all, the design is very critical. Some small copper tube companies are not mature enough in design and have not enough design experience, so they often have problems in design, Hyperbolic copper tube is very famous for preparing some details that we should pay attention to in the design. The sculpted copper tube is highly decorative, and the production and processing technology of hyperbolic shaped copper tube is relatively complex. Copper tube products with strong aesthetics. According to the design requirements, different shapes need to be molded for the sculpted copper tube, so the production process of sculpted aluminum veneer is relatively complex.

.Handle carefully to prevent damage and scratches. 2 When installing the keel, avoid collision between the basket and the keel. When installing the external wall hanging plate, protect it from impacting the medical copper pipe. 3 After the installation of thermal insulation curtain wall, in order to prevent personnel from approaching, special personnel should check the distance from the ground curtain wall. 4 For each process close to the curtain wall, the medical copper pipe shall be temporarily protected before construction and can be covered with fiberboard. Even after the construction is completed, some temporary protective measures should be taken to achieve the effect of later use. 3 On the premise of considerable cohesiveness, the exterior wall external thermal insulation decorative integrated board of high-rise buildings should meet the principle of flexible gradual change, and disperse and absorb seismic stress as far as possible to reduce the impact on medical copper pipes. 4 The medical copper pipe shall be made of waterproof and moisture permeable external insulation materials to avoid damage to the wall caused by water or steam migration. 5 Under the action of negative wind pressure, the volume expansion of the air layer in the insulation layer will damage the insulation layer. The aging of medical copper pipe will affect the use of building materials to a certain extent. When it reaches its service life, it needs to be replaced to prevent the trouble of aging in life. 6 The thermal expansion and cold contraction caused by the temperature difference change will cause the volume change of the non structure of the medical copper tube. Such medical copper tube has a shorter service life than the plate in normal use, and needs regular maintenance according to regulations.

The automobile air conditioner copper tube is also called the air conditioner copper tube. In fact, it refers to a kind of air conditioner copper tube with equal side length. The automobile air conditioner copper tube is made of strip steel as raw material, straightened, curled and welded. Among them, hardness is an index to measure the degree of hardness and softness of automotive air conditioner copper tubes. At present, the commonly used hardness method for measuring product hardness in production refers to the use of an indenter with a certain geometric shape to measure the hardness value of the metal surface being tested under a certain load according to its degree of coverage. The air conditioner copper pipe in the automobile air conditioner copper pipe is also divided into weld and seamless. Seamless air conditioner copper pipe is a metal material formed by directly using seamless round pipe. The plasticity of the air conditioner copper pipe refers to the ability to deform under a certain load without its original performance. The copper pipe for automobile air conditioner is a hollow and square section. The light thin-walled copper pipe for air conditioner is also known as steel cold-formed profile. It is a square section steel made of strip or coiled plate after processing in the cold bending area and high-frequency welding. In addition to being used in the automobile industry the air conditioning copper pipes are used in construction, machinery manufacturing, shipbuilding, solar power generation support, steel structure engineering, electric power engineering, power plants, agricultural and chemical machinery, boiler construction highway railings, housing construction, pressure vessels, oil tanks, bridges power station equipment, lifting and transportation machinery and other high load welding structures. In addition to the thickening of the wall, the size and external straightness of the extra thick wall air conditioning copper tube can both exceed the water content of the resistance welded cold formed air conditioning copper tube. Therefore this kind of automobile air conditioning copper tube has better comprehensive mechanical properties and has the advantages of hot processing, cold processing, weldability and corrosion resistance.

The utility model relates to a connecting structure, in particular to a connecting structure of a copper tube and an aluminum row. At present, most of the copper aluminum transition joints have not been effectively protected. In this way, under the condition of long-time electrification and heating and affected by the water vapor or corrosive gas in the air, the parts at the connection point are more likely to be oxidized, resulting in the reduction of the effective contact area of the connection point, and the excessive heating or even burning of the connection point.


Asbereni304L stainless steel plateQuality inspection method



Handle carefully to prevent damage and scratches. 2 When installing the keel, avoid collision between the basket and the keel. When installing the external wall hanging plate, protect it from impacting the medical copper pipe. 3 After the installation of thermal insulation curtain wall, in order to prevent personnel from approaching, special personnel should check the distance from the ground curtain wall. 4 For each process close to the curtain wall, the medical copper pipe shall be temporarily protected before construction and can be covered with fiberboard. Even after the construction is completed, the exterior wall external thermal insulation decorative integrated board of high-rise buildings should meet the principle of flexible gradual change, and disperse and absorb seismic stress as far as possible to reduce the impact on medical copper pipes. 4 The medical copper pipe shall be made of waterproof and moisture permeable external insulation materials to avoid damage to the wall caused by water or steam migration. 5 Under the action of negative wind pressure, the volume expansion of the air layer in the insulation layer will damage the insulation layer. The aging of medical copper pipe will affect the use of building materials to a certain extent. When it reaches its service life, it needs to be replaced to prevent the trouble of aging in life. 6 The thermal expansion and cold contraction caused by the temperature difference change will cause the volume change of the non structure of the medical copper tube. Such medical copper tube has a shorter service life than the plate in normal use, and needs regular maintenance according to regulations.

The price of tube billets was adjusted and lowered mainly due to the production restriction of environmental protection and the weak demand for temperature and weather. Recently, the terminal demand has also shrunk due to the sudden drop in temperature, causing a weak shock. According to the communication with local traders in Cangzhou, various good news last week led to the shipment of thermal expansion pipes in Cangzhou in the past two weeks which is better in the off-season, and the shipment of some specifications has improved. However, the trading atmosphere in the small and medium-sized pipe market is still cold, and the demand is slowing down gradually. To sum up, it is expected that the market price of Cangzhou seamless pipe will be stable and weak in the near future.

Four in one formula and process conditions Preparation of solution Take formula 1 as an example: mix the calculated amount of water for zinc oxide into a paste, slowly add it into the calculated amount of phosphoric acid under stirring until it is completely dissolved, then add zinc nitrate and tartaric acid, dilute it with water to 2/3 of the total volume, add sodium alkosulfonate and OP emulsion and stir to make it completely dissolved. Then add chromium dihydrogen phosphate dissolved in dilute phosphoric acid,Asberenicopper Stick, and add titanium sulfate. After all materials are added, dilute them to the total volume, stir them to make the solution even, cool them to room temperature, put a large amount of iron filings in the solution, and soak them for 2-3 days to make them contain enough ferrous ions. When the content of ferrous ion reaches above 7g/L, adjust the free acidity and total acidity of the solution to the specified value, and then the solution can be used at elevated temperature. When the ferrous ion reaches the above value, the phosphating speed is fast, the solution is stable, and the phosphating film is fine and dense. During operation, attention shall be paid to controlling the temperature. If the temperature is higher than 70 ℃, the degreasing technology of degreased copper pipe. How to make degreased copper pipe? The process flow of degreased copper tube? What are the characteristics of degreased copper tubes? Use of degreased copper tube? There are too many questions. Let's solve them at once. Everyone knows the copper tube. Nitrate reacts easily. The heater should be installed on the two walls of the tank, to prevent local overheating. Stainless steel pipe or iron pipe should be used for heater, and lead pipe or copper pipe should not be used to avoid contamination of solution by impurities. What is degreased copper pipe? &The advantages of degreased copper pipe's comprehensive treatment of grease, rust removal, phosphating and passivation are described. This comprehensive treatment process can simplify the process, reduce the work area, save equipment costs, shorten working hours improve labor productivity and reduce costs. This method can only be used in the occasions where the requirements for coating quality are not high.However, in actual production, due to the amount of oil contamination, light and heavy rust, the consumption rate of each component in the solution is different, so attention should be paid to adjustment and control to maintain its due role. What is the degreasing copper tube? &I have roughly known the degreasing methods of degreasing copper tubes: solvent degreasing, alkali degreasing, ultrasonic degreasing, high pressure hot water degreasing, electrolytic degreasing, etc. 1 Solvent degreasing: use degreasing solvent to dissolve the oil on the surface of red copper pipe, collect it together into a container, volatilize, collect and reuse the volatile solvent, and separate the pollutants from the circulation system. This method was used in the early stage, which has problems such as low cleaning efficiency, and environmental pollution. In recent years, many kinds of surfactants have been developed.

index.The price can be changed, and the transaction is affected. According to the feedback from the spot operation, the morning market transaction did not follow the temperature rise: after 9:00, the dealers took turns to raise the price, which was in disorder; Before ten o'clock, it was not as expected, and users were very cautious in purchasing; Around 11:00, the surrounding markets became loose and the price was low. High hanging, low selling, and low volume. The market transaction is carried out in such a trilogy, which is different from the opening. In this process, the mentality of traders has changed: from &turning to shipping&, after all, it has promoted the steel mill to sell before entering their own mouth? This is a &manic& market again: failed to continue to rise, spot prices rose; The construction site plan is not much, and the market transaction is weak - this week's trading days, and the transaction was less than expected. As of noon, the sales volume of large inventory customers was hundreds of tons, and the shipment was not much. Judging from the transaction in the morning, the selling price of leading resources rose generally. Among the resources in Kuti, the base price of t2 copper tube was 5050 yuan/ton, and the price of earthquake resistant spiral snail was 5350 yuan; Among the resources provided by the factory, the basic price of threads of Zhongtian, Yonggang and Shagang is 5130 yuan, and the differential between spiral and t2 copper pipes is 360-380 yuan/ton. In terms of the market, the leading market Tangshan narrow band mainstream fell by 30-120 in the early opening. The overall trading situation of copper bars was weak. Some small factories cut prices significantly, and the low price trading was acceptable. Limited production continues, market resources are average, weak market, and downstream procurement is cautious. 355 is the consolidation of the medium broadband market. Today's futures continue to fluctuate. Traders are less willing to ship at low prices and have a strong mood. However under the pressure of futures, the trading atmosphere in the spot market is not good. Copper bars continued to fluctuate in the morning, and traders were affected by multiple factors to make a small weak tone trial deal. From the commercial account, we know that there are few high market transactions, few inquiry calls, and a slightly pessimistic attitude. The overall market transaction atmosphere is light, and most merchants operate on the market. At present, the downstream demand is still low, the demand for terminal replenishment is low, and the purchasing enthusiasm is not high. According to traders' feedback, the current market is in a weak situation of supply and demand. Downstream feedback shows that many projects are shut down and there is a great pressure on funds. However, the relevant economic data and side news are too bearish, so the futures market is difficult to rebound, and the spot market is mainly responsible for the subsequent drop. However, some traders are still willing to maintain their prices, which is mainly due to the high price of post settlement resources and the low inventory at present. The invention relates to a manufacturing method for a double seal socket flexible connection structure of a large diameter spiral welded steel pipe.

Pay attention to the following points when using flame heating brazing: the selection of welding materials The filler metal is wire or rod, with a diameter of about 35mm. The material is: the melting temperature of wire 221 is about 0905 ℃. Its chemical composition is FB10 The composition is 2331% H3BO3 and 6071% KBF The joint form of brazed copper pipe is mostly plug-in. Before cleaning the brazed copper pipe before welding, the edge of the pipe mouth must be corrected and deburred to ensure that the pipe mouth is free of cracks or other defects. And clean the surface of the inserted part. After the red copper pipe is assembled by tack welding, it shall be fixed by tack welding. The number, size and height of tack welds shall be symmetrically and evenly distributed along the circumference from top to bottom, left to right, and the tack welds shall be melted into the whole weld during brazing. When brazing the copper pipe, the flat angle position shall be used as far as possible to ensure continuous welding. Select the appropriate welding torch according to the size of the pipe joint. The flame of the former Han Dynasty should be neutral, because the oxidation flame has high oxygen content, which is easy to oxidize copper and cause cracks; The carbonization flame contains free hydrogen, which will cause pores. When heating pipes before welding, the flame shall be perpendicular to the heating surface, and the base metal shall be heated as quickly as possible to avoid excessive temperature and heating time of the through pipe joints. During the brazing of degreased copper tube, the brazing seam and filler metal shall be under the protection of flame. In addition, it shall be noted that the brazing seam shall be naturally cooled after welding, hot water or wet cloth shall be used to wipe the brazing seam and remove welding slag to improve corrosion resistance and reliability of post welding inspection.

For the production and processing of sculpted copper tubes, the sheet metal shall be first opened in the sheet metal workshop according to the dimensions shown in the drawings, which is commonly referred to as opening. Then cut the corners of these open sheets according to the height of the edge, and then use the bending machine to form the edge according to the drawing forming diagram. The shaped copper pipe shall also be installed with reinforcing ribs as required, and the four corners of the shaped plate shall be welded well. The welded parts shall be sent to the grinding workshop, and the spraying surface shall be polished and the welding interface shall be polished and leveled. The polished modeling copper pipe is then sent to the spraying workshop for processing. Before spraying, the surface of the sculpted copper pipe shall be chrome treated and the process hole shall be drilled, so as to ensure that the sculpted copper pipe can be hung on the spraying line well, and the painting can be smooth without flow marks, and the color is consistent without color difference. After that, according to customer demand, the qualified products are pasted with protective film and bound with bubble film or wooden box.


Asbereni304L stainless steel plateQuality inspection method



The selection of medical copper tube table, these problems are natural.

discount.Pay attention to the following points when using flame heating brazing: the selection of welding materials The filler metal is wire or rod, the edge of the pipe mouth must be corrected and deburred to ensure that the pipe mouth is free of cracks or other defects. And clean the surface of the inserted part. After the red copper pipe is assembled by tack welding, it shall be fixed by tack welding. The number, size and height of tack welds shall be symmetrically and evenly distributed along the circumference from top to bottom, left to right, and the tack welds shall be melted into the whole weld during brazing. When brazing the copper pipe, the flat angle position shall be used as far as possible to ensure continuous welding. Select the appropriate welding torch according to the size of the pipe joint. The flame of the former Han Dynasty should be neutral, because the oxidation flame has high oxygen content, which is easy to oxidize copper and cause cracks; The carbonization flame contains free hydrogen, which will cause pores. When heating pipes before welding, the pipe joints shall be heated evenly and the base metal shall be heated as quickly as possible to avoid excessive temperature and heating time of the through pipe joints. During the brazing of degreased copper tube, the brazing seam and filler metal shall be under the protection of flame. In addition, it shall be noted that the brazing seam shall be naturally cooled after welding, and the weldment shall not be moved before the brazing seam has solidified. After natural cooling after welding, hot water or wet cloth shall be used to wipe the brazing seam and remove welding slag to improve corrosion resistance and reliability of post welding inspection.

Therefore, it is often used in some ah heat exchangers to Kazakhstan oxygen equipment.

However, for some important parts, it is also considered that the yield ratio should be smaller to improve their safety and reliability. However, at this time, the utilization rate of materials is also low. Common sense: copper pipes for air conditioners are mainly used for conveying liquid, gas and steam; Boiler pipes and steam transmission pipes are used for the piping structure and steam transmission of steam boilers, including the transmission of high-temperature and high-pressure steam; Structural pipe, widely used in aviation automobile, mainly used for oil and gas exploitation, such as casing, drill pipe and tubing, and pipe for petroleum refining and processing; Pipe for mechanical manufacturing, which is used to manufacture the race of ball bearing, the plunger, rotating shaft and body of air pump and hydraulic pump; High pressure vessel, used for manufacturing bottles, boilers shells, etc. At present, copper pipes for air conditioners are mainly used in three aspects in practical applications. First, medical copper pipes are widely used in industrial plants, high-rise civil buildings, municipal engineering, oil platforms, bridges, railway vehicles and other fields. Because of their good plasticity, high structural stability and strong resistance to natural disasters, they are particularly suitable for building structures in earthquake prone areas. Second, the air conditioning copper pipe has high tensile strength and toughness, high buildings, bridges and other steel structures have good cold bending performance and welding performance, and the section size and surface quality are well controlled, so it is widely used in vehicle manufacturing, large bridge construction,Asbereni316L stainless steel plate, mechanical manufacturing, industrial plant components and many other industries. Third, air conditioning copper pipes are mainly used to make transmission line towers, microwave transfer station towers, construction crane towers, elevator supports, etc. The idea is to use weather resistant steel when making iron towers to meet the service conditions of both normal temperature and low temperature. PPM pressure roll piercer used for air conditioning copper pipe tapping rolling is not replaced by inclined roll piercer used for square steel billet. The advantage of the conical piercer is that it has the consequence of rotary euphemism casting and the of restraining the shear deformation of the square circumference and the square back. Therefore, it can prevent the defects outside the steel pipe. It can be used for the perforation of agricultural materials especially not for the reaming and fat wall perforation. When using a general piercer, while when using a square cone piercer the wall thickness/pitch diameter ratio (T/D limit is about 6%, the T/D limit can be 2%. Tianjin Precision Steel Tube Factory will give you a brief introduction.

Asbereni.Copper tube can be strengthened by heat treatment, its strength is higher than that of copper tube, and its high temperature oxidation resistance is also better. When the aluminum content is greater than 7% and 8%, the strength increases, but the plasticity drops sharply. Therefore, it is mostly used as cast or after hot working. The abrasion resistance and corrosion resistance of copper tube in atmosphere, seawater, seawater carbonic acid and most organic acids are higher than those of copper tube. Copper tubes can be made.

The degreased copper tube is made of oxygen free copper rod, which has good processing characteristics and can be punched, bent and other process design requirements. The surface can be subject to anti-corrosion treatment, such as nickel plating,AsbereniAluminum rod, tin plating, zinc plating, etc. The surface anti-corrosion can reach 72 hours of fog test. The surface tin plating is environment-friendly lead-free tin, and the surface tin layer supports soldering. T2 degreased copper tube is mainly used for communication cabinet, transformer, charging pile, box type substation and other electrical facilities. The copper bar is harder than the plastic pipe and has the degree of common metal (the strength of the cold drawn degreased copper pipe is equivalent to that of the steel pipe with the same wall thickness). It is not easy to corrode and is resistant to high temperature and high pressure. It can be used in various applications. The main material of copper bar is copper. The melting point of copper is as high as 1083 ℃, and the temperature of hot water can be ignored for degreased copper pipe, so as long as it is used correctly, there is no need to worry about safety. When choosing to decorate the house, the material of water supply pipeline will greatly affect people's health. T2 copper tube has strong capacity. Escherichia coli in the water supply will not continue to breed in the degreased copper tube, and copper ions have a strong ability. Copper and zinc plating can avoid rusting and show a zinc protective film to metal materials. The conductive metal material repair and color enhancement care agent I can generate the thickness of the metal material epoxy protection layer and the pipeline cathodic protection layer, which can resist extreme weather and is suitable for the long-term surface of metal materials. The actual effect of salt and water corrosion resistance is good. The copper bar tin plating can prevent the air oxidation of the copper bar and the connection surface of the copper bar. In addition, the melting of metal tin and copper will produce aluminum alloy, which will improve the adhesion of copper strip coating. In addition, the conductivity of metal tin is good. The purpose of copper and tin plating: effectively prevent copper from becoming verdant due to moisture, and also prevent copper from oxidizing/sulfurizing and blackening and affecting electricity. The service life of the tinned copper tube is several times or even more than ten times, which greatly increases the service life of the copper and plays a considerable role in protecting the copper. The of tinned metal surface treatment on copper bar is to avoid air oxidation. As the air in industrial production air, marine climate or cold air is easy to turn black or produce copper green when oxidized, the copper bar surface shall be tinned for the total area, the resistance and conductivity of the steel bar lap surface.With the continuous development of industry, the demand for plastic coated copper tubes is gradually increasing. Then how to apply wood grain paint on alloy pipes. Wood like paint is a kind of wood like paint. It is used for spraying plastic coated copper pipe and its process flow. Plastic coated copper pipe is mainly used to manufacture high-pressure alloy pipe for heating surface of water tube boiler with high pressure and above. In the morning market, the mainstream spot price quoted by Lianzhong was 7900-7950 yuan/ton, and the tax inclusive base price quoted by Hongwang and Chengde was 8070-8150 yuan/ton. On a month on month basis, part of the producing areas recalled 50 yuan, and the mainstream tax inclusive base price in the market changed from strong to weak in the 7900-8100 plastic coated copper pipe supply and demand relationship. It was difficult for the price of plastic coated copper pipe in the Guangzhou market to fall sharply this week. Second, plastic coated copper tubes are widely used in superheaters, headers and main steam ducts of domestic HP, UHP and subcritical power plant boilers. Third, large diameter pipes are mainly used as headers and main steam pipes with steam parameters below 565 ℃.

It is applicable to the removal of thin liquid oil stain and light rust and the generation of phosphating film with certain corrosion resistance. See Table 3 for example of formula and operating conditions. Table 3 Degreasing, rust removal