Before installing the elevator, confirm whether the motor and the elevator are intact and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

Different. (Specific bearing capacity and lifting height can be designed and customized according to user requirements)

Guangxi.Replace with new oil and do not intermittently use the old oil, otherwise the moving parts in the system will accelerate wear.

Test the goods elevator every day to see if it can operate normally.

.Large logistics warehousing equipment service company with guaranteed prices and guaranteed services, directly operated by the manufacturer. Because fixed elevators are mechanical equipment, the quality and performance of the product are good. Do not accept products from some manufacturers that do not meet the quality standards, in order to avoid some safety hazards in use.

Systems: explosion-proof electronic control system, PIC system.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.


GuangxiElevating cargo elevators requireTechnological innovation



Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the steam crane.

The guide mechanism of the guide mechanism of the guide rail elevator manufacturer is mainly composed of guide plastic pipes, guide brackets,GuangxiTwo ton guide rail type cargo elevator, compression springs, safety plugs, guide housings, and guide shafts. As a semi sectional view of the guide mechanism, a narrow gap is formed between the two guide plastic pipes, and the lifting cloth belt extends out of the box from this narrow gap to prevent the cloth belt from being tangled and serve as a guide. The safety plug is supported by a guide bracket and a compression spring. In order to prevent the compression spring from losing stability after being stressed, a small guide rod is designed on the safety plug, and the gap between the small guide rod and the spring is designed according to the table. The crane arm shaft is welded and installed with a crane arm hook at both ends. The material is selected and subjected to conditioning treatment. It forms three suspension points with the hook at the lower shell of the box. The soft support sling will be lifted by the person being lifted. The load bearing capacity of the crane arm is designed to ensure that the person being lifted can be in a comfortable state when riding. The distance between the two crane arm hooks is listed in the table as a design reference,GuangxiWarehouse elevator, The material is designed as a hollow tube reducing the overall weight of the boom.

Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the steam crane.

Online consultation.The common types of elevators will be briefly introduced here. I hope you can have a better understanding of this product. Currently, this product can be said to be sold well in China, because many places need to use this kind of product with lifting function and flexible movement. Now, companies specializing in producing this type of product combine with extensive external publicity on the Internet, Friends in need can directly find the corresponding company on the Internet, and then have a brief understanding of the model, performance, and price information of these products. They can purchase directly through the Internet.

Different. (Specific bearing capacity and lifting height can be designed and customized according to user requirements)

It is strictly prohibited for personnel to climb up and down the floors by using the goods elevator privately.


GuangxiElevating cargo elevators requireTechnological innovation



Nowadays, small and medium-sized enterprises are products with the idea of good quality and preferential prices.

Market trend.This fixed lifting device can also be used inside a warehouse, especially during storage. Store in a cool and dry place, and avoid rainy and snowy weather during work.

Before installing the elevator, confirm whether the motor and the elevator are intact,GuangxiProduction of simple lifting cargo elevators, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

Guangxi.Connect the motor to the elevator naturally. During connection, it must be ensured that the concentricity of the elevator output shaft and the motor input shaft is consistent, and that the outer flanges of the two are parallel. Inconsistent centering can cause the motor shaft to break or the elevator gear to wear.

Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that remove the motor shaft key.