Saint-Quentin Guide rail lifting cargo elevatorHow to adjust the glass to a better state

announcer:hp779HP136589660 release time:2024-05-02 15:48:24

with a scissors type mechanical mechanism

Test the goods elevator every day to see if it can operate normally.

Safety performance: The lifting structure is made of high-strength manganese steel rectangular tubes, and high bearing capacity. The lifting height is about 10 meters strong stability, and the load capacity is about 10 tons.

Saint-Quentin .The transportation lifting platform only needs

Incorrect connection of the elevator motor When a coil, coil group, or one phase winding group is connected inversely, it can cause a serious imbalance in the three-phase current and cause the winding to overheat.

.Usage: Scissor fork type fixed lifting platforms are mostly used for goods transportation between height differences in production lines, adjusting the working height during workpiece assembly, feeding materials to loading machines at high altitudes, lifting components during assembly of large equipment, matching storage and loading sites with forklift trucks and other transportation vehicles for rapid loading and unloading of goods, vehicle lifting, fixed three-dimensional parking, and other places.

The motor winding is short-circuited. When a short circuit fault occurs in the motor winding, the short circuit current is much larger than the normal working current, which increases the copper loss of the winding, causing the winding to overheat or even burn out.

Secondly, there should be no dirt on the friction surface. If there is any dirt, it should be washed off with gasoline or thinner; The reduction gearbox,Saint-Quentin Small cargo elevator, gearbox, external meshing gear and other parts of the equipment, as well as the hydraulic oil, must be tested according to the requirements in the table; Correct maintenance of the hydraulic guide rail elevator: Regularly inspect the wire ropes at various parts for broken wires and looseness. If any such phenomenon is found, replace it in a timely manner. The maintenance of the wire ropes must be carried out in strict accordance with the specifications; Check the connection condition of each part according to the braking rules and regulations. If there is any looseness, tighten it in a timely manner. Check the tightness of the connecting bolts of the equipment when the body is under pressure. All connecting shafts should be equipped with cotter pins; Check whether the operation of each mechanism is normal, whether there are noises and faults according to regulations, and promptly remove all faults; When installing, disassembling, and adjusting the rotating mechanism of the equipment, it is important to note that the reducer and the gear center line should be parallel,Saint-Quentin Guide rail chain type lifting cargo elevator, and the meshing clearance should be appropriate; Regularly conduct a comprehensive inspection of the equipment to see if there is any damage to the wires and cables,Saint-Quentin Guide rail type cargo elevator, and if there is overheating of the motor. Replace the motor in a timely manner and eliminate the fault before continuing operation; Ensure that the bearings boxes, distribution boxes, and brushes of the motor are kept clean, and that the travel switch points of each safety device must be safe and reliable.


Saint-Quentin Guide rail lifting cargo elevatorHow to adjust the glass to a better state



Test the goods elevator every day to see if it can operate normally.

What is the solution to the problem of rust on the surface of the spiral elevator? Sandpaper has a large loss on the spiral elevator itself. Specializing in products, renewable resources business, including: elevator factory

Before installing the elevator, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

How many?.Walking: assisted self-propelled, two wheel traction, self driving, and car modification.

The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure provides stability for the lift. The wide working platform and high bearing capacity make the high-altitude operation range wide and suitable for multiple people to work simultaneously. It makes aerial work efficient and guaranteed.

The purpose of hydraulic lifting platform Users can choose the power mode and configuration according to their own scope of use: power systems include: DC power supply, single-phase or three-phase power supply, diesel engine.


Saint-Quentin Guide rail lifting cargo elevatorHow to adjust the glass to a better state



Usage: Scissor fork type fixed lifting platforms are mostly used for goods transportation between height differences in production lines, loading and unloading materials, feeding materials to loading machines at high altitudes, lifting components during assembly of large equipment, matching storage and loading sites with forklift trucks and other transportation vehicles for rapid loading and unloading of goods, vehicle lifting, fixed three-dimensional parking, and other places.

Fair price.Does the cleanliness of the hydraulic station have relevant rules and requirements?

'The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time after rising to a specified position. Of course, this problem must be abnormal, so how can we solve it?'? The first step is to find the reason, and the following editor summarizes the ultimate solution.

This fixed lifting device can also be used inside a warehouse, such as lifting a certain layer of the warehouse to transport goods or personnel to a designated warehouse location.

Saint-Quentin .The purpose of hydraulic lifting platform Users can choose the power mode and configuration according to their own scope of use: power systems include: DC power supply, single-phase or three-phase power supply, and provide safety technical disclosure to installation personnel.

To ensure excellent power supply at the installation site, install a separate distribution box. When using the distribution box, the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.