NetherlandsFloor to floor cargo elevatorTechnology upgrading promotes progress

announcer:hp779HP136589660 release time:2024-05-02 12:33:48

This fixed lifting device can also be used inside a warehouse, with a scissors type mechanical mechanism, easy to maintain strong stability, and high bearing capacity. The lifting height is about 10 meters, and the load capacity is about 10 tons.

Netherlands.When using, the four legs should be firmly supported on a solid ground (subject to the fact that the walking wheel is about to leave the ground). Sleepers can be used when necessary.

The water cooling of hydraulic stations is generally tubular water cooling, and the type selection is based on the heat load to calculate the heat exchange area while the air-cooled elevator is conducted using an air cooler, and the heat exchange capacity is calculated based on the heat load. Then, the type selection calculation is performed when the flow can be satisfied. Therefore, the two types of cooling are different, and there are significant differences. Long-term lifting and lowering of cargo elevator factory

.The load of this series of products is divided into 0.1 to 0.8 tons, and can also be customized according to user requirements, with a load of up to 10 tons.

Before installing the elevator, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft,NetherlandsChain guide rail lifting cargo elevator, and elevator groove of the motor.

Several types: motor winding open circuit. When one phase of the motor winding is open circuit, or one of the parallel branches is open circuit, it will cause three-phase current imbalance and cause the motor to overheat.


NetherlandsFloor to floor cargo elevatorTechnology upgrading promotes progress



Is the water cooling and air cooling of the hydraulic station the same?

In fact, it is also important to pay attention to some details, as follows: It is actually difficult to pierce the bearings into the shaft pins when excessively installing them. However, sometimes, some people think of using a hammer to hammer the bearings to facilitate the installation, directly striking the bearings with a hammer can cause significant damage to the bearings, which is the main reason for causing bearing damage and reducing the service life of the bearings. So when installing bearings, we must not go too far. Fortunately, we can place some soft cloth or cardboard on top of them before installing them.

Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

Lets see.Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.

Safety performance: The lifting structure is made of high-strength manganese steel rectangular tubes, with a scissors type mechanical mechanism, easy to maintain, strong stability, and high bearing capacity. The lifting height is about 10 meters, and the load capacity is about 10 tons.

The hydraulic lifting platform can be divided into four wheeled mobile type, two wheeled traction type, vehicle modified type,NetherlandsEnterprise elevator, vehicle type, auxiliary self-propelled type, single-phase or three-phase power supply, diesel engine.

query.It is strictly prohibited for personnel to climb up and down the floors by using the goods elevator privately.

How to install and use the bearings of the elevator During the process of installing the bearing device of the elevator, we cannot always ensure that the bearing device has the correct orientation, which inevitably leads to some devices not in place or bearing misalignment. Once these problems occur in the device, and then the inner and outer rings of the bearings cannot be located at the same rotation center. Therefore, when installing bearings, it is necessary to use specialized tools, and in the future, it is also necessary to use a detector to test the bearing device, so as to ensure the success of the bearing device.

Prepare the foundation according to the foundation plan pay attention to alignment, leveling, and alignment, and ensure the level of the foundation and various usage requirements.

Netherlands.It is good for aerial work vehicles not to cover their clothes and park outside. If it is windy and rainy, the clothes will repeatedly slap the car paint, especially if the vehicle blows sand on the clothes, causing many fine scratches on them, as the paint will become black over time. In addition, when the wind does not directly spray powder or clean the mechanism on the sand, it should be washed with water, and prevent the vacuum cleaner of the aerial work vehicle from scratching the sand particles on the paint surface.

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type and iron plate sealed type.

Before installing the elevator, confirm whether the motor and the elevator are intact,NetherlandsGuide rail chain lifting cargo elevator, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.