Spiegel Kenneth10 meter cargo elevatorDesign features explored

announcer:hp779HP136589660 release time:2024-04-14 11:29:48

adjust the PCS system ring to align its side hole with the dustproof hole

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, and tighten with the hexagon socket. After that, remove the motor shaft key.

The load of this series of products is divided into 0.1 to 0.8 tons, and can also be customized according to user requirements, with a load of up to 10 tons.

Spiegel Kenneth.Transportation lifting platforms need to be considered. However, in the use of elevators, some relatively large locations will purchase lifting platforms suitable for their own needs based on user requirements, which means that oversized equipment will have difficulties in transportation. This is also a concern for many users and manufacturers. The equipment is large in size and occupies a large area, making it difficult to move back and forth, and it is very difficult to move, So how should we solve it? Today, I will introduce to you in detail how large lifting platforms solve the problem of transportation difficulties.

Knowledge popularization and superior performance of scissor fork type fixed lifting platform: equipped with safety devices to prevent overloading of the lifting platform; Equipped with a protection valve to prevent hydraulic oil pipe from cracking; Equipped with an emergency lowering device for sudden power failure; The doors of the upper and lower floors are equipped with safety devices that interlock with the system.

.For guideway elevators installed outdoors, they are often exposed to rain and sunlight so special attention should be paid to regular maintenance and inspection to avoid accidents.

Before connecting the motor to the elevator, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

Before installing the elevator, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, the platform is level with the ground, without occupying ground space and affecting passage passage.

In fact, it is also important to pay attention to some details, as follows: It is actually difficult to pierce the bearings into the shaft pins when excessively installing them. However, sometimes some people think of using a hammer to hammer the bearings to facilitate the installation, and use brute force during installation. In fact, directly striking the bearings with a hammer can cause significant damage to the bearings, which is the main reason for causing bearing damage and reducing the service life of the bearings. So when installing bearings, we must not go too far. Fortunately, we can place some soft cloth or cardboard on top of them before installing them.

Frequently check for water accumulation and humidity. It is inevitable for aerial vehicles to drive in rainy and snowy weather, or muddy roads. The bottom and some gaps and indoor floors are prone to sludge accumulation. If the owner does not clean them in a timely manner, this can cause moisture to hide. Therefore, activities in the outer edges of wheel hubs, doors, bottom corners of tree trunks, key holes, and wiper brackets, as well as other areas, should be regularly inspected, and the drainage holes in the doors and various parts should be kept unblocked to ensure that the car seat covers, such as humidity, carpets, and floors, prevent rust from forming parts.

Create brilliance.Before connecting the motor to the elevator the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress,Spiegel KennethSimple track lifting cargo elevator, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

When a cargo elevator fails, it should be repaired by professional personnel. It is not allowed to modify the cargo elevator without permission.

The common types of elevators will be briefly introduced here. I hope you can have a better understanding of this product. Currently, this product can be said to be sold well in China, because many places need to use this kind of product with lifting function and flexible movement. Now, companies specializing in producing this type of product combine with extensive external publicity on the Internet, Friends in need can directly find the corresponding company on the Internet, performance, and price information of these products. They can purchase directly through the Internet.


Spiegel Kenneth10 meter cargo elevatorDesign features explored



Corrosion prevention measures for the body of aerial work vehicles Attention to small scratches The paint surface of aerial work vehicles often corrodes. In addition to common collisions, scratches and small rocks on the drive tire, there can also be a paint peeling point that can cause a small rust over time. Because most of these scars are small and easy to ignore. Therefore, regularly inspect the engine compartment lid and surrounding areas, and once found, go to a professional beauty shop for processing in a timely manner.

production costs.The load of this series of products is divided into 0.1 to 0.8 tons, and can also be customized according to user requirements, with a load of up to 10 tons.

Any kind of machine or equipment will undergo a series of inspections and debugging before leaving the factory, until all links are qualified. Take the mobile elevator for example, the same is true. Of course, during the internship, but if there is no contact, just mastering some specific information can effectively handle these questions.

Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress,Spiegel KennethConstruction site lifting and cargo elevator lifting, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

Spiegel Kenneth.Incorrect connection of the elevator motor When a coil, or one phase winding group is connected inversely, it can cause a serious imbalance in the three-phase current and cause the winding to overheat.

Corrosion prevention measures for the body of aerial work vehicles Attention to small scratches The paint surface of aerial work vehicles often corrodes. In addition to common collisions, scratches, and small rocks on the drive tire, there can also be a paint peeling point that can cause a small rust over time. Because most of these scars are small and easy to ignore. Therefore, regularly inspect the engine compartment lid and surrounding areas, and once found, go to a professional beauty shop for processing in a timely manner.

Systems: explosion-proof electronic control system, remote control system, PIC system.