The installation is simple, fast and firm. At least one part of the grouting conduit buried in the concrete shall be firmly bound with the structural reinforcement; The length of the grouting duct leading out of the concrete shall not be less than 150mm; The leading end of the grouting conduit shall be set at a convenient and accessible position. No part of the grouting conduit shall be flattened or bent to avoid affecting the flow of grout. The opening end of the conduit shall be temporarily blocked to prevent foreign matters from entering. The damaged part of the grouting pipe shall be cut off, and the grouting pipe with the installed grouting pipe shall be re set at the cut-off part, and shall be overlapped with the original grouting pipe at both ends.When binding or welding reinforcement near the grouting pipe, temporary shielding measures shall be taken to protect the grouting pipe. The calculation of the reserved expansion amount of the grouting pipe and the bridge expansion joint changes all the year round. With the change of temperature and the change of vehicle live load, the bridge will shrink and deform. The grouting pipe and the bridge expansion joint play a major role at this time. The expansion amount of the grouting pipe and the expansion joint must be calculated accurately. The installation and construction of the grouting pipe and the expansion joint need to ensure the quality. We should select the model and type of grouting pipe and bridge expansion joint, and determine the installation time, installation season and temperature of grouting pipe and expansion joint. Calculate the large and small preload of grouting pipe and expansion joint.

Grouting pipe is a kind of embedded grouting pipe system, which is used for permanent sealing of construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very important to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC end grouting pipe merchants set on the surface can choose to ship at a fair price to reduce the purchase when the future market trend is not clear, and the inventory of grouting pipes has decreased slightly. Affected by insufficient demand, the transaction has been tepid, and the daily turnover is basically below 50 tons. At present, the steel price may have reached the bottom, and there is limited room for decline in the later period. The future price may still be dominated by maintaining stability. Affected by the fact that Bagang has delivered less resources recently, some local specifications are out of stock, and businesses are also reluctant to sell. However, the overall structural adjustment pressure of the steel industry is obvious, and there are downside risks to economic growth. In addition, the overall performance of the manufacturing industry is still relatively sluggish, and the price policy of first-line steel mills in October also maintained a stable but declining tone. At present, the pressure of the grouting pipe steel traders to withdraw funds and the tightening tone of the central bank's monetary policy kept the overall liquidity tight. In addition, the differentiation of cold and hot-rolled price trends combined with the decline of the overall profitability of the current steel industry will make steel mills or increase their power to produce current star products. Therefore, we still need to be vigilant about the hot-rolled market, and there will not be much reversal in the short term. From the performance of the internal and external markets, the game between the long and short sides is prominent, and the short side increases the price, which makes the iron ore market rise and touch the wall. It is expected that the iron ore will maintain the interval fluctuation state in the near future, and the fluctuation space of the grouting pipe is limited. This method can seal the joint. The grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way. Manufacturing method of fast cutting device in the hole of underground grouting pipe [Patent Abstract] the utility model discloses a fast cutting device in the hole of underground grouting pipe, a tension blade device and a cutting rotation device . The tension blade device is sleeved in the cutting rotation device. The tension blade device and the cutting rotation device are connected by threads A blade tightening nut is arranged at one end of the tightening blade device extending out of the cutting rotating device. The cutting blade and pulley are fixed and installed on both sides of the cutting rotating device. The utility model is arranged in the grouting pipe, which reduces the operating intensity of workers by using the lead screw principle. The rotary cutting in the casing reduces the quantities of clearing the tunnel floor; The cutting depth can also be adjusted at will according to the actual situation of the roadway. The working efficiency is 4-5 times higher than that of manual cutting, which can greatly reduce the labor intensity of workers.

Richmond mountain.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - 5% ~ + 10%. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken but the tensioning force limit shall not be greater than 0.8fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C40. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to 0.5-0.6mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than 30mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.

When installing the Hainan grouting pipe, carefully check the embedded reinforcement in the groove before the joint is lowered. If cracks or breaks are found, the position is improper or the gap is too large, remedial measures must be taken.

.It is a kind of embedded grouting pipe system, which is used for permanent sealing of construction joints, cold joints,Richmond mountainSupport advance small conduit, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water penetrates into the joint it can be sealed by injecting slurry into the PVC port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way. Injecting grout into the embedded grouting pipe can seal construction joints, pipe leakage and joints between the ground walls.

Full section slurry discharge (4 slurry discharge holes) is uniform and smooth.

The installation will not affect the characteristics of the building grouting pipe itself; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed; Ccll-y series grouting pipe: grouting once, not reusable ccll-d series grouting pipe: multiple times of grouting, grouting is not limited by time.It is applicable to waterproof joints of subway, tunnel and basement. If there is water leakage, grout can be injected into the pipe body to fill and seal. It is very suitable to install grouting pipes between the joints of new and old concrete. Various materials such as cement slurry, polymer slurry and polyurethane chemical slurry can be injected. When water penetrates into the joint, the joint can be sealed by injecting slurry into the PVC port or spring skeleton port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way.


Richmond mountainGrouting flower tubeMarket share



Inner diameter of repetitive grouting pipe: 8mm; Outer diameter: 20mm Inner diameter tolerance: ± 0.3mm; Length of each roll: 90m.

Answer: it varies according to the model and elasticity of the grouting pipe and its internal pressure can reach 150bar or more.

Features of reusable grouting pipe: with one-way switch . Good anti blocking property and no backflow of slurry.

Product line.[0007] further, the outer diameter of the cutting rotary device is 2mm smaller than the inner diameter of the grouting pipe.

Installation of grouting pipe the method of installing grouting pipe is to bundle the grouting pipe and add 300-500mm semi-circular flower pipe at the upper end of the reinforcement construction; As the project is a bored pile, the commonly installed grouting pipe is a straight pipe. A diffuser with one-way is set at 300min below the pipe. The grouting pipe is installed at the end of the reinforcement cage installation and sediment treatment (because the end of the bored pile is cone-shaped, in order to avoid damaging the one-way diffuser at the end of the grouting pipe when lowering the reinforcement cage, it is not appropriate to bundle the grouting pipe on the reinforcement cage and lower it at the same time.) The grouting pipe is set in the diffuser with one-way , and the upper end of the grouting pipe should be blocked.

The cement grouting method is applicable to the grouting of gravel layer and rock fissure. Ordinary portland cement is generally used, the water cement ratio is 1:1, and 2% ~ 5% water glass can be added as the accelerator. Ordinary extrusion mortar pump is used for grouting, and the maximum grouting pressure shall not exceed 1MPa. For silty fine sand and cohesive soil with permeability coefficient less than 10-4cm / s, split grouting can be adopted. The consistency of the cement slurry used for split grouting is large, the utility model provides a fast cutting device in the hole of the underground grouting pipe in order to solve the problems of the prior art which can reduce the operating intensity of workers by using the lead screw principle, reduce the quantities of clearing the roadway floor by using the rotary cutting in the casing, and adjust the cutting depth at will according to the actual situation of the roadway.

Test conclusion.Polymer chemical grouting method is applicable to reinforcement of sandy soil foundation, curtain grouting of dam foundation, water stop and leakage stoppage of underground engineering, reinforcement of muddy interlayer of dam foundation and fault fracture zone. There are many varieties of polymer chemical pulp materials, including epoxy resin,Richmond mountainSupport small conduit, acrylamide (propionate), polyurethane (cyanogen), lignin etc. Acrylamide and polyurethane are commonly used in chemical grouting of foundation. Acrylamide pulp is composed of main agent acrylamide and various admixtures. The viscosity of the slurry is close to water, and it has good groutability. After the slurry solidifies, the gel is impermeable, and has good durability and stability. This kind of slurry is widely used in seepage prevention grouting of fine rock cracks and medium fine sand layers and dynamic water leakage stoppage projects. This kind of pulp has certain toxicity and pollutes air and groundwater. The polyurethane slurry is mainly composed of polyisocyanate and polyether resin, and then mixed with various admixtures. After the slurry is poured into the formation, it reacts with water to form polyurethane foam, which can strengthen the foundation and prevent seepage and leakage. Polyurethane slurry can be divided into water-soluble and non-water-soluble. The water-soluble polyurethane can be miscible with water and react with water to form an aqueous gel; Water insoluble polyurethane can only be miscible with organic solvents. Polyurethane slurry has low viscosity, good groutability, high stone strength, safety and reliability, no pollution to the environment simple operation and high economic benefits.

The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.

Features: the grouting pipe is divided into disposable grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe).

Richmond mountain.[specific embodiment] [0015] the following describes the utility model in combination with the attached specific embodiments.

Inverted formwork shall be used to install stairs and side formwork of components to increase the turnover rate of formwork. According to the design size, the formwork shall be cut with plate shears, edge folding machines, profile training machines, the moisture content of sand and stone shall be measured and the construction mix proportion shall be adjusted according to the test results.

Grouting classification (I) grouting construction before and after the exposure of water bearing rock and soil layer is classified as follows: Pre grouting: the grouting works carried out before the shaft, tunnel, basement and other structures are dug or when they are close to the aquifer are called pre grouting. Ground pre grouting and working face pre grouting are common in the coal industry. The pre grouting method is used for water plugging and reinforcement of rock and soil to prevent accidents in advance.