TanobjegHydraulic guide rail type cargo elevatorThere are many reasons for the continued strength

announcer:hp779HP136589660 release time:2024-02-21 09:54:49

Corrosion prevention measures for the body of aerial work vehicles Attention to small scratches The paint surface of aerial work vehicles often corrodes. In addition to common collisions, scratches and small rocks on the drive tire, there can also be a paint peeling point that can cause a small rust over time. Because most of these scars are small and easy to ignore. Therefore, regularly inspect the engine compartment lid and surrounding areas, and once found go to a professional beauty shop for processing in a timely manner.

The hydraulic lifting platform can be divided into four wheeled mobile type, two wheeled traction type, vehicle modified type, vehicle type, auxiliary self-propelled type, and the lifting height varies from a meter to 1 meter.

Tanobjeg.'The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time after rising to a specified position. Of course this problem must be abnormal, mainly used in industrial buildings, restaurants, docks warehouses, workshops, and other places where vertical cargo handling is required between two or more floors. The low height is particularly suitable for sites that are not suitable for digging pits on site. What issues should we pay attention to in these places where elevators are used?

.After the goods are transported, clean the platform.

What types of elevators are there? There are many types of such equipment, such as fixed lifting devices and vehicular lifting devices, depending on the form of movement. The so-called fixed lifting is generally installed in one place and fixed, and some large production lines need to lift the materials to a certain position when loading them, and then put them into production on the production line. A special lifting device needs to be fixed at a certain position on the production line.

Nowadays, small and medium-sized enterprises are products with the idea of good quality and preferential prices.


TanobjegHydraulic guide rail type cargo elevatorThere are many reasons for the continued strength



The water cooling of hydraulic stations is generally tubular water cooling, and the type selection is based on the heat load to calculate the heat exchange area, while the air-cooled elevator is conducted using an air cooler, and the heat exchange capacity is calculated based on the heat load. Then, the type selection calculation is performed when the flow can be satisfied. Therefore, the two types of cooling are different,TanobjegFloor to floor cargo elevator, and there are significant differences. Long-term lifting and lowering of cargo elevator factory

If the hydraulic valve is damaged, its effectiveness should be maintained. If it is damaged, it can be replaced in a timely manner.

Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranking outriggers, and pull-out outriggers.

Sales Department.Before installing the elevator, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

Fixed elevator is a transportation equipment that directly lifts and loads goods from the ground. It is mainly used for goods transportation between height differences in production lines, material loading and unloading, component lifting during assembly of large equipment, fixed three-dimensional parking, and other places. So what is the new price for fixed elevators?

The motor winding is short-circuited. When a short circuit fault occurs in the motor winding, the short circuit current is much larger than the normal working current, which increases the copper loss of the winding, causing the winding to overheat or even burn out.


TanobjegHydraulic guide rail type cargo elevatorThere are many reasons for the continued strength



Carefully prepare a special construction plan for installation and construction, and provide safety technical disclosure to installation personnel.

Excellent service.Before installing the elevator, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

It is strictly prohibited to connect the motor of the lifting platform to the wrong power supply. It should be ensured that the voltage is 380v or 220v, and daily cleaning work should be carried out. Dust and debris on the motor should be cleaned in a timely manner.

Motor connection error. When the triangular connection motor is mistakenly connected into a star shape, the motor still operates with full load, and the current flowing through the stator winding exceeds the rated current, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, the motor is mistakenly connected into two branches in parallel, both the windings and the iron core will overheat, and in severe cases, the windings will be burned.

Tanobjeg.Scissor type fixed lifting platform is a transportation and loading equipment that transports goods from one height to another. After operation, the platform is level with the ground, without occupying ground space and affecting passage passage.

Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

The water cooling of hydraulic stations is generally tubular water cooling, and the type selection is based on the heat load to calculate the heat exchange area, while the air-cooled elevator is conducted using an air cooler, and the heat exchange capacity is calculated based on the heat load. Then, the type selection calculation is performed when the flow can be satisfied. Therefore, the two types of cooling are different, and there are significant differences. Long-term lifting and lowering of cargo elevator factory