AneznoFloor lift cargo elevatorHow to divide responsibilities

announcer:hp779HP136589660 release time:2024-02-20 12:45:37

Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation, or muddy roads. The bottom and some gaps and indoor floors are prone to sludge accumulation. If the owner does not clean them in a timely manner, this can cause moisture to hide. Therefore, activities in the outer edges of wheel hubs, doors bottom corners of tree trunks, key holes,AneznoProfessional cargo elevator, and wiper brackets as well as other areas, should be regularly inspected, and the drainage holes in the doors and various parts should be kept unblocked to ensure that the car seat covers, such as humidity, carpets, and floors, and in severe cases can cause the motor to burn out.

It should be noted that compared to some lifting platforms in certain venues, protective barriers are generally added to the platform. As lifting platforms belong to special equipment, the National Quality Inspection Bureau strictly inspects this area. Any lifting platforms that are deemed to have safety hazards must be removed. Therefore, when personnel ask if you need to add guardrails, do not blindly refuse, and consider whether it is necessary based on the site of use. 'In addition, it is necessary to possess two types of certificates, namely, the Special Equipment Manufacturing License of the People's Republic of China and the Special Equipment Installation, Transformation, and Maintenance License of the People's Republic of China, before production, installation, and maintenance can be conducted. Therefore, it is necessary to ask the manufacturer whether they possess these two types of certificates.'.

.Motor connection error. When the triangular connection motor is mistakenly connected into a star shape, the motor still operates with full load, and the current flowing through the stator winding exceeds the rated current, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, the motor is mistakenly connected into two branches in parallel, both the windings and the iron core will overheat, and in severe cases, the windings will be burned.

Test the goods elevator every day to see if it can operate normally.

What is the new price for fixed elevators? Professional improvement of the quality assurance of the elevator factory. Preferential activities are ongoing, welcome new and old customers to consult


AneznoFloor lift cargo elevatorHow to divide responsibilities



Scissor type fixed lifting platform is a transportation and loading equipment that transports goods from one height to another. After operation, the platform is level with the ground, without occupying ground space and affecting passage passage.

The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance, eliminate hidden dangers, extending the service life of the equipment, there should be no dirt on the friction surface. If there is any dirt, it should be washed off with gasoline or thinner; The reduction gearbox, gearbox, external meshing gear, and other parts of the equipment, as well as the hydraulic oil, must be tested according to the requirements in the table; Correct maintenance of the hydraulic guide rail elevator: Regularly inspect the wire ropes at various parts for broken wires and looseness. If any such phenomenon is found, replace it in a timely manner. The maintenance of the wire ropes must be carried out in strict accordance with the specifications; Check the connection condition of each part according to the braking rules and regulations. If there is any looseness, tighten it in a timely manner. Check the tightness of the connecting bolts of the equipment when the body is under pressure. All connecting shafts should be equipped with cotter pins; Check whether the operation of each mechanism is normal, whether there are noises and faults according to regulations, and promptly remove all faults; When installing, disassembling, and adjusting the rotating mechanism of the equipment, it is important to note that the reducer and the gear center line should be parallel, and the meshing clearance should be appropriate; Regularly conduct a comprehensive inspection of the equipment to see if there is any damage to the wires and cables, and if there is overheating of the motor. Replace the motor in a timely manner and eliminate the fault before continuing operation; Ensure that the bearings, boxes, distribution boxes, and brushes of the motor are kept clean, and that the travel switch points of each safety device must be safe and reliable.

Excellent quality.The cleanliness of the hydraulic station is an important aspect of the elevator hydraulic station, so it should not be taken lightly. Moreover, from a professional perspective, there are relevant rules and requirements. You should refer to the specification manual, so that you can have a correct understanding and know how to achieve better cleanliness.

Prepare the foundation according to the foundation plan pay attention to alignment, leveling, and alignment, and ensure the level of the foundation and various usage requirements.

Is the water cooling and air cooling of the hydraulic station the same?


AneznoFloor lift cargo elevatorHow to divide responsibilities



The common types of elevators will be briefly introduced here. I hope you can have a better understanding of this product. Currently, this product can be said to be sold well in China, because many places need to use this kind of product with lifting function and flexible movement. Now, companies specializing in producing this type of product combine with extensive external publicity on the Internet, Friends in need can directly find the corresponding company on the Internet, and then have a brief understanding of the model, performance and price information of these products. They can purchase directly through the Internet.

Direct labor.Prepare the foundation according to the foundation plan,AneznoCargo elevator, pay attention to alignment, leveling, and alignment, and ensure the level of the foundation and various usage requirements.

After careful inspection, it was found that there were two main causes: loss of hydraulic pressure, and leakage of hydraulic valves or seals.

What is the new price of fixed elevators? Fixed elevators are currently very popular in the market. Due to different manufacturers, different materials, different load ratings, and different brand awareness, the prices also vary. Currently, lifting height 7 meters,AneznoLifting cargo elevator 3 tons, table size 2500 mm * 2000 mm, and the price is around 27000-45000 yuan; The rated load is 1-3 tons, the lifting height is 0 meters, the table size is 2300 mm * 2000 mm, and the price is around yuan. Rated load and lifting height of each fixed elevator,

Anezno.Low cost: Compared to the scissor type mobile lifting platform, the cost is much lower. Therefore, when purchasing a lifting platform, it is necessary to consider the use range, frequency of work, load, and other factors of the lifting platform to select a lifting platform suitable for the work requirements.

To ensure excellent power supply at the installation site, the selection of the leakage switch should be compatible with the frequency converter.

Outriggers: mechanical outriggers the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, hydraulic outriggers, ordinary hand cranking outriggers, and pull-out outriggers.