polandCustomized cargo elevatorHow to do a good job if you want to avoid failures

announcer:hp779HP136589660 release time:2024-02-18 12:34:52

After the goods are transported, clean the platform.

Before connecting the motor to the elevator, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data and the use of elevators and lifting platforms shall be checked

poland.The solenoid valve on the motor should not be adjusted randomly. The solenoid valve is pre adjusted before leaving the factory, and random adjustment can easily cause internal pressure to increase or decrease, clean the platform.

.'Using the elevator is not about maintaining and overhauling the equipment after it has failed. It is important to maintain the equipment in accordance with the correct maintenance and overhaul. First do the preparatory work to eliminate all possible fault problems and accidents. I hope that today's summary of knowledge points by the editor can help everyone.'.

The hydraulic lifting platform can be divided into four wheeled mobile type, two wheeled traction type, vehicle modified type, auxiliary self-propelled type and the lifting height varies from a meter to 1 meter.

Several types: motor winding open circuit. When one phase of the motor winding is open circuit, or one of the parallel branches is open circuit, it will cause three-phase current imbalance and cause the motor to overheat.


polandCustomized cargo elevatorHow to do a good job if you want to avoid failures



Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

When using, the four legs should be firmly supported on a solid ground (subject to the fact that the walking wheel is about to leave the ground). Sleepers can be used when necessary.

Prepare the foundation according to the foundation plan, pay attention to alignment, leveling, and alignment, and ensure the level of the foundation and various usage requirements.

middleman.Knowledge popularization and superior performance of scissor fork type fixed lifting platform: equipped with safety devices to prevent overloading of the lifting platform; Equipped with a protection valve to prevent hydraulic oil pipe from cracking; Equipped with an emergency lowering device for sudden power failure; The doors of the upper and lower floors are equipped with safety devices that interlock with the system.

After the goods are transported, clean the platform.

In addition, it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation,polandOne ton cargo elevator, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.


polandCustomized cargo elevatorHow to do a good job if you want to avoid failures



'Using the elevator is not about maintaining and overhauling the equipment after it has failed. It is important to maintain the equipment in accordance with the correct maintenance and overhaul. First, do the preparatory work to eliminate all possible fault problems and accidents. I hope that today's summary of knowledge points by the editor can help everyone.'.

Welcome calls .What is the new price for fixed elevators? Professional improvement of the quality assurance of the elevator factory. Preferential activities are ongoing, welcome new and old customers to consult

'Before installing the elevator bearings, we should never open the packaging prematurely. This can easily lead to premature bearing contamination, which can lead to premature bearing damage. In addition, when installing, it is necessary to ensure that the device environment is clean and not to bring iron filings, dust, and other things into the bearings, as even some small dust,',poland10 meter cargo elevator, If it continues for a long time, it will also affect the running-in between bearings, leading to a decrease in the life of the elevator.

Motor connection error. When the triangular connection motor is mistakenly connected into a star shape, the motor still operates with full load, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, the motor is mistakenly connected into two branches in parallel, both the windings and the iron core will overheat, and in severe cases, the windings will be burned.

poland.The cleanliness of the hydraulic station is an important aspect of the elevator hydraulic station, so it should not be taken lightly. Moreover, from a professional perspective, there are relevant rules and requirements. You should refer to the specification manual, so that you can have a correct understanding and know how to achieve better cleanliness.

The motor winding is short-circuited. When a short circuit fault occurs in the motor winding, the short circuit current is much larger than the normal working current, which increases the copper loss of the winding, causing the winding to overheat or even burn out.

The water cooling of hydraulic stations is generally tubular water cooling and the type selection is based on the heat load to calculate the heat exchange area, while the air-cooled elevator is conducted using an air cooler,polandIndustrial cargo elevators, and the heat exchange capacity is calculated based on the heat load. Then, the type selection calculation is performed when the flow can be satisfied. Therefore, the two types of cooling are different, and there are significant differences. Long-term lifting and lowering of cargo elevator factory