KalukumbePower electronic controlThis week's price shock is weak, and downstream procurement is cautious

announcer:hp122HP117294921 release time:2024-01-20 12:50:51

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Kalukumbe.The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

.Manufacturing process and steps of dry-type transformer

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, commerce, airports, tunnel construction, chemical enterprises and factories.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.


KalukumbePower electronic controlThis week



(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side,KalukumbeUnit price of scb11 dry type transformer, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

The transformer manufacturer will introduce the efficiency of the transformer to you

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

The cheapest.Wiring mode of dry-type transformer:

The hanging core of dry-type transformer is a vital part

For no-load impulse closing of transformer, pay attention to the following matters:


KalukumbePower electronic controlThis week



Dry type transformer company

Installation materials.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined,KalukumbeCommercial power transformer, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance in other words,KalukumbeEuropean box type transformer, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

Kalukumbe.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

During no-load test run, and then make the working voltage impulse closing.

Protective measures for damping of dry-type transformer