and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

Marshall Islands.Automatic system of centrifugal fan: measure the temperature data signal according to the PT100 thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches 110 ℃ the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as 90 ℃,Marshall IslandsTransformer distribution equipment, the system software will automatically terminate the centrifugal fan.

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer,Marshall IslandsPower transformer price, and the vibration reduction solution is made at the cable bridge.

.The bearing capacity of each load is different. Generally dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited,Marshall IslandsPrice of dry-type transformer 2500, the generator set must be disassembled first.

Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

Oil immersed transformer

Inspection items.Power transformer plant

Connection group structure of dry-type transformer

According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.


Marshall IslandsPrice of box type transformerPublish Operation Guide



Sound in case of phase failure

quality standard.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

How is the quality level of dry-type transformer compared with foreign countries?

Oil leakage at looper flange

Marshall Islands.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

Oil leakage of heat pipe radiator

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.