Sihu Self propelled lifting platformThe manufacturer tells you the focus of buying

announcer:hp275HP127226562 release time:2024-01-18 13:45:06

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, and adjusting the rotating mechanism disassembling, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable for each box, distribution box, etc., and should be kept clean regularly. Dust on electrical equipment should be cleaned in a timely manner. When encountering overheating in the electric motor, it is necessary to stop it in a timely manner and troubleshoot before continuing to operate. The motor bearings should be in good condition, and the hydraulic cargo elevator should provide us with safety protection. The application of hydraulic cargo elevators in our production is already very common, and plays an important role in our production, especially in high-altitude operation of goods.

When the lifting base plate descends, the safety net below immediately stops running and descends when encountering obstacles.

.Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder,Sihu Mobile boarding bridge price, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, easy operation, visual display of the position of the elevator car on the floor, with automatic and manual options.

The design of support points for selecting process parameters is to avoid energy consumption and noise generation due to collision between components and supports during vibration. The supports should be arranged near the nodal line and the layout principle is: when the aspect ratio of the component is greater than 2, two point supports can be used; When the aspect ratio is close to 1, it is advisable to use or 4-point support.

Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance and fire and high temperature resistance, Strong overload capacity, corrosion resistance, radiation resistance, long service life. The top layer height is not affected, and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories,Sihu Self propelled mobile lifting platform, and can be used both internally and externally.


Sihu Self propelled lifting platformThe manufacturer tells you the focus of buying



02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

Leakage occurs due to looseness, vibration, and the influence of heat on the sealing surface and pipe joints of the machine; Some casting, processing and other defects are difficult to detect during assembly and debugging, but due to vibration and impact during the operation process, these defects are exposed, manifested as oil (water) leakage. Therefore, leakage is prone to occur during the running-in period. Poor, due to the small fit clearance of newly assembled components and the difficulty in ensuring the uniformity of fit clearance due to assembly and other reasons, oil (grease) is not easy to form a uniform oil film on the friction surface to prevent wear. This reduces efficiency and causes early abnormal wear of the components. In severe cases, it can cause scratches or bite on the friction surface of precision fitting, leading to the occurrence of faults.

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

consumption.Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.

The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat


Sihu Self propelled lifting platformThe manufacturer tells you the focus of buying



Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, 20 year old brand with price advantages and guaranteed quality!

Lets see.The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating, hot plating, spray plating, etc., to coat the surface of steel with a layer that is not easily corroded

The wear rate is fast, and due to factors such as processing, assembly, and adjustment of new machine components, the friction surface is rough, the mating surface area is small, and the surface pressure condition is uneven. During the operation of the machine, the concave and convex parts on the surface of the parts are intertwined and rubbed against each other. The metal debris that falls off from the grinding process, in turn, acts as abrasive and continues to participate in friction, further accelerating the wear of the mating surface of the parts. Therefore, during the running-in period, it is easy to cause wear on components (especially the mating surface), with a fast wear rate. At this point, it may cause damage to the components and lead to early failures.

Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Sihu .However, large welded structural components have the characteristics of complex morphology, large weight, large differences in residual stress size and distribution, and it is difficult to achieve good results using ordinary vibration aging technology. Therefore, it is crucial to develop a reasonable process. Therefore, they found Nanjing Juhang and our JH-700 vibration aging equipment, and requested us to develop a complete vibration aging process.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

According to calculations,Sihu Hydraulic aluminum alloy hydraulic lifting platform, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.