HandanStage electric elevatorRegarding the use area and operation

announcer:hp935HP175192871 release time:2024-01-15 10:01:51

when there is a major malfunction of the lifting platform

Later,Handan3 meter electric elevator, it should be repaired by professional personnel as soon as possible. After the malfunction occurs,HandanElectric portable elevator, it should not be used again to avoid accidents, personnel and property losses.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Handan.Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

The scaffolding of the parking platform should be laid tightly and firmly.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door


HandanStage electric elevatorRegarding the use area and operation



Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

And prevent it from starting normally. There should be no device that allows users to cancel warning signals.

The quality of the standard section should comply with the product manual and specification requirements.

Create brilliance.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door,HandanNew electric elevator, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.


HandanStage electric elevatorRegarding the use area and operation



To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Information recommendation.For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, all components should be inspected, but also have an overflow valve to prevent excessive system pressure during upward movement

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.