MaceSelf propelled electric elevator,

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations and the table top is equipped with anti slip insulation buckle plates, insulation which have anti slip, and safety features. Please rest assured to use.

Mace.Electric lifting machinery, as an important product of social development in China, which greatly tests the professionalism and attention of operators. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at a few common sense issues: the manufacturer of electric elevators is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, as long as these problems are not very serious, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, causing unnecessary casualties; 2. Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, once the relief valve is adjusted, it may cause abnormal operation of the hydraulic system, causing unnecessary damage to people, machines, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

Construction electric elevators outside the lightning protection range

.Acceptance: Concrete strength grade C30, strength testing report.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.


MaceElectric self-propelled elevatorCheck after use



When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

The upward movement of the hydraulic cylinder involves lifting heavy objects, and the return oil from the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve. The additional pressure relief valve is used for adjustment, and the pressure gauge reads the value when observing the pressure gauge

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective whether there is a lack of hydraulic oil, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

build.When the landing door is closed, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least 150mm above the ground.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.


MaceElectric self-propelled elevatorCheck after use



Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Inspection environment.To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference,MaceSmall electric hydraulic elevator,MacePure electric curved arm elevator, ensuring the safety of the cast members.

When using lifting equipment, the workbench should be kept in a horizontal state.

The counterweight guide rail should meet the specification requirements.

Mace.The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.