WarsawElectric elevators for elderly careIndustry inspection explanation

announcer:hp935HP175192871 release time:2024-01-14 11:46:43

When the wall bracket adopts non matching standard products design calculations should be carried out.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Warsaw..

Acceptance: Concrete strength grade C30, strength testing report.

.It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, 220V or 380V power supplies, diesel engines,WarsawElectric brick elevator on construction site, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip insulation, and safety features. Please rest assured to use.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.


WarsawElectric elevators for elderly careIndustry inspection explanation



Low power consumption: When the hydraulic guide rail lifting platform descends,WarsawRechargeable electric elevator, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

The downward movement of the hydraulic cylinder (i.e. heavy object lowering). The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder passes through the balance valve, hydraulic control one-way valve, energy-saving valve, and explosion-proof electric valve

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

consumption.When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, it worked normally.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.


WarsawElectric elevators for elderly careIndustry inspection explanation



Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

Lets see.The landing door should meet the requirements of the specifications and achieve standardization.

The safety overtravel of limit switches and upper limit switches should comply with regulatory requirements.

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

Warsaw.Monthly maintenance and inspection of hydraulic lifting platform rollers intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil,WarsawElectric high-altitude elevator, tighten the joint, remove the oil filter, clean it with compressed air, strength testing report.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.