Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Wanghua.Lower limit switch: In normal working state, before the suspension cage touches the buffer,WanghuaFixed electric hydraulic elevator, the lower limit switch first acts.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Installation and dismantling personnel and drivers should hold certificates to work.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings,WanghuaZoomlion Electric Elevator, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark,Wanghua6m electric elevator, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.


WanghuaFixed electric elevatorBring you to understand the new situation



The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Before installing the construction electric elevator, the foundation should be inspected and approved before installation.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Quality documents.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, design calculations should be carried out.

Analysis project.Later, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

When adding hydraulic oil, it is also necessary to pay attention to the structure of the oil cylinder. Some oil cylinders are relatively complex internally, and how many lifting operations need to be carried out during filling to fully fill each position of the hydraulic oil. Therefore, try to add as much as possible, and then test and run the machine empty to see if it reaches the rated position.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Wanghua.Installation and dismantling personnel and drivers should hold certificates to work.

The counterweight guide rail should meet the specification requirements.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.