Menshing GladbachCar mounted scissor liftOffer summary

announcer:hp323HP155335083 release time:2024-01-10 10:03:38

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

For the safety performance of high-altitude work platforms, scientific processes, and strict management to ensure production. When in use, people, the environment, and machines are the three major links of high-altitude operations, and safety is the basic condition to ensure the smooth progress of high-altitude operations. In the following text, Jiuyi briefly describes the precautions for using high-altitude operation platforms: high-altitude operators must hold a health certificate. Individuals with mental illness, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.

Menshing Gladbach.Ensure excellent power supply at the installation site, install a separate distribution box, and the electrical leakage switch must meet the requirements for construction elevators when using the distribution box. If the installed construction elevator is variable frequency, the leakage switch should be compatible with the frequency converter when selecting it.

The method is that it may cause increased wear and inflexibility of the parts, and it is also important to pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore,Menshing GladbachElectric hydraulic elevator 15 meters, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.

.What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, scientific processes it is necessary to have production technology, and strict management to ensure production. When in use, people, the environment, and machines are the three major links of high-altitude operations, and safety is the basic condition to ensure the smooth progress of high-altitude operations. In the following text,Menshing GladbachFixed hydraulic elevator, Jiuyi briefly describes the precautions for using high-altitude operation platforms: high-altitude operators must hold a health certificate. Individuals with mental illness, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.


Menshing GladbachCar mounted scissor liftOffer summary



Install two more standard sections. Check and adjust the verticality of the guide rail frame with a theodolite to ensure that the error in two mutually perpendicular directions meets the requirements of Table 1. The above two parts are about the installation precautions for the elevator. If your work involves operating or installing the elevator, everyone must pay attention to safety.

For some site lifting platforms protective railings are generally added above the platform. As lifting platforms are special equipment, when asked if you want to add protective railings the National Quality Inspection Bureau strictly inspects this area. Any lifting platforms that are deemed to have safety hazards must be removed. Therefore, do not blindly refuse. Consider whether it is necessary based on the site of use. And it is necessary to have two types of certificates, namely the 'Special Equipment Manufacturing License of the People's Republic of China' and the 'Special Equipment Installation, Transformation, and Maintenance License of the People's Republic of China', in order to produce, install, and maintain. Therefore, it is necessary to ask the manufacturer whether they have these two types of certificates.

2: Chemical rust removal mainly involves the use of acid to react with the metal components of the screw elevator to remove rust products from the rust surface of the push rod. This type of rust removal is mainly used for large mechanical screw elevators, and attention should be paid to protecting precision devices such as electronic instruments from acid corrosion during use.

middleman.According to different needs, different power modes can be selected, single-phase AC power supply, DC power supply, and internal combustion power supply. With manual hydraulic equipment, lifting operations can be carried out in places with power outages or no power supply, and components can be added. When the platform length is insufficient, it can be extended to the required direction, and then the operating power can be increased. It is a must-have product of modern large-scale construction and equipment, and a necessity for high-altitude safety and civilized production.

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.


Menshing GladbachCar mounted scissor liftOffer summary



The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Online consultation.Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

Nowadays, small and medium-sized enterprises embrace the idea of good quality and discounted prices for their products.

High altitude operations involving single person work such as high-altitude cleaning. Products, tens of millions of products for you to choose from, professional elevator manufacturers ensure safe trading

Menshing Gladbach.Curved arm elevator: a lifting device used for high-altitude operations, which can cross obstacles for high-altitude operations. When the platform is lifted to any position, it can operate while walking, with a compact structure and flexible turning. The width of its site can ensure that the equipment enters narrow passages and crowded working areas. The backup power device can operate the work platform to reset,Menshing Gladbach15 meter elevator, and is a convenient transportation method that can be towed to any place.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.