StuttgartElectric hydraulic platform elevatorDesign features

announcer:hp935HP175192871 release time:2024-01-04 10:45:29

Horizontal lead screw mechanical electricity

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Stuttgart.Greater than 0.04s; When the hydraulic buffer is used, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed,StuttgartElectric one ton elevator, the cage shall not

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes

.A complete lifting platform accessory can be selected and customized according to different places, venues, and environmental usage conditions. Meet the needs of different users. So why lifting platforms can be used and installed in so many industries and places is because they can achieve multi-purpose,StuttgartElectric mini elevator, demonstrate multifunctional, and win market demand. In modern industrial transportation processes, lifting platforms have begun to play an increasingly important role, docks,StuttgartAutomatic elevator electric small, warehouses floors, workshops and other places that require rapid loading and unloading of goods, they have played a very practical value, It has also brought great contributions to the entire industry and even the entire economic development. However, long-term operation and use of these devices inevitably lead to wear and consumption, and regular maintenance and upkeep are essential. Otherwise, both work efficiency and utilization rate will decrease, and at that time the gains and losses will outweigh the losses.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, the user unit shall organize the leasing unit with a size of 8 meters by 2 meters.


StuttgartElectric hydraulic platform elevatorDesign features



After the electric elevator passes the inspection, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

The shutdown device (emergency stop switch) should be non automatic reset type.

The scaffolding of the parking platform should be laid tightly and firmly.

superior quality.The verticality of the guide rail frame should meet the requirements of the specifications.

The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.


StuttgartElectric hydraulic platform elevatorDesign features



When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

market.Installation and dismantling personnel and drivers should hold certificates to work.

The cargo is 0.5m.

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.

Stuttgart.Use floor doors and cage door devices on construction sites where conditions permit.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.