TanobjegSelf propelled electric elevatorHow should the industry market go?

announcer:hp935HP175192871 release time:2023-12-29 11:09:18

The scaffolding of the parking platform should be laid tightly and firmly.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

Tanobjeg.The movement of its related components is direct.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

.To meet the needs of choreographers and choreographers in different plays different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.


TanobjegSelf propelled electric elevatorHow should the industry market go?



When the landing door is closed, the full width of the lifting passage opening should be covered.

Construction electric elevators should be equipped with upper limit switches that are sensitive and reliable.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high,TanobjegAutomatic electric elevator, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space,TanobjegPortable electric elevator, and ensure that the lifting platform can be lifted to the rated lifting height.

Total quality assurance.Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.


TanobjegSelf propelled electric elevatorHow should the industry market go?



After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Interpretation and observation.For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Tanobjeg.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, effective protective measures should be taken.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).