Jhingergacha10kV box type power transformerMain economic and technical indicators are stable and improving

announcer:hp122HP117294921 release time:2023-12-27 09:43:06

Common problems of tap changer of power transformer

The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat,Jhingergacha10kV dry type transformer, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, to occupy the main global technical position the transformer industry depends on two key data, commodity volume and voltage level. As early as & ldquo; Eleventh Five Year Plan; In the early stage China has been a powerful country in the production, manufacturing and application of dry-type transformers all over the world, but it is not a big country.

Oil leakage of porcelain pot and laminated glass oil level gauge

.35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.


Jhingergacha10kV box type power transformerMain economic and technical indicators are stable and improving



Dry type transformer factory

Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.

Protective measures for damping of dry-type transformer

total cost.Oil leakage at looper flange

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;


Jhingergacha10kV box type power transformerMain economic and technical indicators are stable and improving



It will also produce many faults, make full use of the performance indicators and advantages of oil immersed transformer, and short-circuit fault is more general.

technological innovation.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Transformer manufacturers generally adopt IP20 protective casing, which can avoid the entry of solid dirt with a diameter of more than 12mm, rats, snakes, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure,JhingergachaPower transformer parameters, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, which can avoid being equally divided with the above IP20 protective effects However, IP23 casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.

Wiring mode of dry-type transformer:

Jhingergacha.Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil,JhingergachaInsulation grade of power transformer, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).