The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

Darkuleb.This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

Power transformer plant

.Sound in case of phase failure

Method and process of taking oil sample of power transformer

If the volume of power transformer is too small,DarkulebSupply of power transformer, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.


DarkulebDry type transformer model makingFull of opportunities



Power transformer

Transformer inspection nose sniffing method

Oil leakage of cast iron parts

Home page recommendation.Fault judgment of power transformer

The hanging core of dry-type transformer is a vital part

What is the important role of power transformer


DarkulebDry type transformer model makingFull of opportunities



After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Honest service.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

When the transformer is put into operation, if the tap changer is not in time a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, once the load increases it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

Darkuleb.In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, it will affect the whole power circuit

According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

Some are tied with plastic tape, and some immediately press the two edges together,DarkulebOil immersed air-cooled transformer, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.