CarlosaElectric elevator mobile typeWhat are the common failure problems

announcer:hp935HP175192871 release time:2023-12-21 09:45:47

Setting requirements: The landing door should be standardized and tooled.

Stage equipment safety door. To prevent personnel from extending their heads, hands,CarlosaElectric cargo elevator, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Carlosa.The upward movement of the hydraulic cylinder involves lifting heavy objects, and the return oil from the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve. The additional pressure relief valve is used for adjustment, and the pressure gauge reads the value when observing the pressure gauge

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements,CarlosaElectric mini elevator, but safety should be maintained.

Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.


CarlosaElectric elevator mobile typeWhat are the common failure problems



The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Degrees, m/s.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Customer first.The entrance of each landing platform must be equipped with a landing door,CarlosaElectric passenger lift, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

When the wall bracket adopts non matching standard products, design calculations should be carried out.


CarlosaElectric elevator mobile typeWhat are the common failure problems



Before operating the construction electric elevator, otherwise protective measures shall be taken.

When adding hydraulic oil, we can extend the oil cylinder to the high position for filling. When filling, the lifting platform should not exceed the high position, and then retract the oil cylinder back to the low position to check if the hydraulic oil level is lower than the low position, and maintain it between the two.

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, its calculation sheet, design and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Carlosa.The use of standard section connecting bolts should comply with the user manual and specification requirements.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.