WittenElectric three wheel elevatorKey factors of market competition

announcer:hp935HP175192871 release time:2023-12-18 09:24:53

The landing door should meet the requirements of the specifications and achieve standardization.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Witten.And prevent it from starting normally. There should be no device that allows users to cancel warning signals.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

.Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.


WittenElectric three wheel elevatorKey factors of market competition



Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Create brilliance.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Every theater is a public place with a large number of people,WittenSmall electric loading elevator, and safety considerations should be taken into account in stage design. According to relevant national regulations,WittenFlagpole electric elevator, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.


WittenElectric three wheel elevatorKey factors of market competition



The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Inspection basis.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

.

Protective measures should comply with regulatory requirements.

Witten.The landing door should meet the requirements of the specifications and achieve standardization.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator,WittenElectric barrier free elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.