goyard Price of 1000 KVA dry type transformerStatus of motion fault diagnosis

announcer:hp122HP117294921 release time:2023-12-17 11:00:56

Causes of fire in power transformer

Oil leakage of heat pipe radiator

goyard .How is the quality level of dry-type transformer compared with foreign countries?

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%,goyard Oil immersed amorphous alloy transformer, 50% and 75% by grade.

.High voltage fuse of transformer breaks one phase;

Brief introduction of zero line of power transformer

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.


goyard Price of 1000 KVA dry type transformerStatus of motion fault diagnosis



Oil leakage of cast iron parts

The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we have already mastered the structure and characteristics of dry-type transformer. In this part, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.

Sound in case of phase failure

Lets see.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified,goyard Supplied by dry-type transformer manufacturer, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Protective measures for damping of dry-type transformer


goyard Price of 1000 KVA dry type transformerStatus of motion fault diagnosis



When the power transformer operates at full load, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

Discount.How much is the power transformer

Transformer inspection nose sniffing method

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times,goyard S11 parameters of oil immersed transformer, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

goyard .In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and the vibration reduction solution is made at the cable bridge.

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.