NispoliniInsulation grade of power transformerReturn to stability

announcer:hp122HP117294921 release time:2023-11-21 09:28:41

the transformer shall be placed for 24h

Operation and maintenance management of oil immersed transformer

Before no-load impulse closing, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Nispolini.The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

The key reason for oil leakage is that there are defects in cast iron parts

Some are tied with plastic tape and some immediately press the two edges together, and there is still oil leakage without sealing effect.


NispoliniInsulation grade of power transformerReturn to stability



After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Once the insulation material of electrical equipment is overheated,NispoliniMaintenance standard of dry type transformer, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.

The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.

Inspection standard.From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;

Oil leakage of bolt or pipe external thread

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.


NispoliniInsulation grade of power transformerReturn to stability



The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

Price.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.

Automatic system of centrifugal fan: measure the temperature data signal according to the PT100 thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches 110 ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as 90 ℃, the hanging core of dry-type transformer should be carried out according to the above matters and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, so as to promote the safety of dry-type transformer!

Nispolini.For no-load impulse closing of transformer,NispoliniPrice of 50 KVA box type transformer, pay attention to the following matters:

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases,NispoliniSubstation transformer, power off immediately for maintenance.

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).