HalleyPrice of 5000KVA transformerInner and outer diameter size

announcer:hp122HP117294921 release time:2023-11-08 10:49:29

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

Halley.Transformer inspection nose sniffing method

Oil leakage of bolt or pipe external thread

.Oil leakage at electric welding position

Dry type transformer manufacturer

Connection group structure of dry-type transformer


HalleyPrice of 5000KVA transformerInner and outer diameter size



Before no-load impulse closing, the transformer shall be placed for 24h,HalleyTransformer temperature in high voltage distribution room, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?

Power transformer plant


HalleyPrice of 5000KVA transformerInner and outer diameter size



Dry type transformer manufacturer

middleman.In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer and must be technically as a certain pillar. Only in that way, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment,Halley630 dry type power transformer, the output capacity can be increased by 20%.

Halley.What about oil immersed transformer fire?

What is the wiring mode of dry-type transformer?

Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod,HalleyPower transformer technology series, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.