Construction electric elevators outside the lightning protection range

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

Fengnan.The down travel (limit) switch should be of the automatic reset type.

The scaffolding of the parking platform should be laid tightly and firmly.

.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Implementing multiple shifts of homework should fill in and submit records according to regulations.


FengnanSelf propelled electric elevatorEnterprise



Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

And prevent it from starting normally. There should be no device that allows users to cancel warning signals.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

management.Use floor doors and cage door devices on construction sites where conditions permit.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation,FengnanNew electric elevator,FengnanElevator electric micro,FengnanElectric elevator factory, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.


FengnanSelf propelled electric elevatorEnterprise



The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Welcome calls .Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The use of fully autonomous electric elevators can create more benefits and ensure safety in all aspects.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Fengnan.Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

The scaffolding of the parking platform should be laid tightly and firmly.

The counterweight guide rail should meet the specification requirements.