Gloucester Rupp3150 power transformerManufacturing process analysis

announcer:hp122HP117294921 release time:2023-10-23 18:31:41

Dry type transformer factory

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

Gloucester Rupp.Transformer

Noise solution of dry-type transformer

.Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products,Gloucester RuppInspection items of oil immersed transformer, electrical components and insulating raw materials.

For no-load impulse closing of transformer, pay attention to the following matters:

Fault judgment of power transformer


Gloucester Rupp3150 power transformerManufacturing process analysis



In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, the safety and fire safety technical specifications on the spot shall be strictly implemented.

How much is the power transformer

In order to better carry out the experiment of power transformer oil anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

The transformer manufacturer will introduce the efficiency of the transformer to you

The hanging core of dry-type transformer is a vital part

original.When oil samples are used, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.


Gloucester Rupp3150 power transformerManufacturing process analysis



Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side,Gloucester RuppPower supply high frequency transformer, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited,Gloucester RuppReactor and transformer, the generator set must be disassembled first.

average method.The method and whole process of taking oil sample of power transformer are as follows:

Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches 155 ℃, the system software outputs the overtemperature alarm system; If the temperature rises to 170 ℃ again and the transformer can no longer operate, and the transformer shall be tripped quickly.

Oil leakage at looper flange

Gloucester Rupp.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).