and the distance shall not be less than 1m; At the angle with actual operation

Dry type transformer

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer,ZanstadScb10 dry type transformer, a spacing of more than 2m shall be reserved; If metal fence is selected, the resistance value of the grounding wire shall be measured accurately every two years.

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

.According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

The main reason is that the welding quality of electric welding is poor, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil,ZanstadDifference between power transformer and dry-type transformer, slow aging of insulation, short circuit fault between boxes, in some cases, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars, little dragons & rdquo;, Therefore, the loss of transformer full load and load must be considered in the calculation and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: 3. The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer 1. Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P, and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust,ZanstadTransmission transformer, and has sound insulation and noise reduction.

Interpretation and observation.When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

Oil immersed transformer company

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.


ZanstadSCB dry type transformer modelInvestment and industry remain the focus



Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

Free consultation.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches 155 ℃, the system software outputs the overtemperature alarm system; If the temperature rises to 170 ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.

When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

Zanstad.Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.