SeihbergSmall mobile electric elevatorEconomic slowdown is a healthy adjustment

announcer:hp935HP175192871 release time:2024-09-12 13:42:59

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors,SeihbergSimple electric hoist cargo elevator, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Seihberg.The down travel (limit) switch should be of the automatic reset type.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Protective measures should comply with regulatory requirements.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, smooth lifting and low noise.

The stopper bearing of the mechanism is kept intact.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Product survey.When the landing door is closed, the full width of the lifting passage opening should be covered.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.


SeihbergSmall mobile electric elevatorEconomic slowdown is a healthy adjustment



Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Quality improvement.Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

There is a certain itinerary.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Seihberg.Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

The verticality of the guide rail frame should meet the requirements of the specifications.

In order to meet the needs of contemporary audiences and achieve perfect effects,SeihbergElectric barrier free elevator, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables,SeihbergSelf propelled electric elevator, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.