TucsonElectric scissor liftHow companies stand out

announcer:hp935HP175192871 release time:2024-09-08 15:38:21

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Tucson.Greater than 0.04s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed, the cage shall not

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

.Setting requirements: The wall bracket should use the manufacturer's matching standard products.

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting,TucsonDC electric elevator, low noise long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.


TucsonElectric scissor liftHow companies stand out



Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

When adding hydraulic oil, we can extend the oil cylinder to the high position for filling. When filling, the lifting platform should not exceed the high position, and then retract the oil cylinder back to the low position to check if the hydraulic oil level is lower than the low position, and maintain it between the two.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

management.Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.


TucsonElectric scissor liftHow companies stand out



When the landing door is closed, the full width of the lifting passage opening should be covered.

Discount.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements,TucsonElectric elevator battery, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Precautions for safe use of electric elevators: Before use, remove any obstacles or debris near the electric elevator that may hinder operation and check whether the operating handle can be used normally.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

Tucson.Once again, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage,TucsonSmall 100kg electric elevator, an extended stage, an island stage an intermediate stage, a T-shaped stage, or a hall.

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.