Use a heavy crane to lift the cage and accurately position it from above the standard section; Place the two suspension cages on the guide rail frame and slowly place them on the buffer spring. Prepare the drive frames of the two suspension cages and adjust each back wheel and roller to a position with a large gap to facilitate the installation of the drive frame. Install a standard section on the basic part of the elevator using heavy equipment and tighten the connecting bolts. Install two sets of drive frames above each suspension cage using heavy equipment and thread the connecting pins, and install the cage top guardrail.

The normally closed valve and motor are energized simultaneously; The solution is correct wiring, confirm whether the motor and elevator are intact, and strictly check whether the dimensions of each part connected to the motor and elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

.Install two more standard sections. Check and adjust the verticality of the guide rail frame with a theodolite to ensure that the error in two mutually perpendicular directions meets the requirements of Table 1. The above two parts are about the installation precautions for the elevator. If your work involves operating or installing the elevator, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards, remove the motor shaft key.


VeronaFor elevator construction sitesAppearance processing work



The appearance of hydraulic boarding bridges to customers, and the demand for boarding bridges is also increasing. However, there are not many manufacturers of corresponding boarding bridges. Many boarding bridge companies are leather bag companies, and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car booths and there are often deviations when passing on the technical requirements of direct customers to the manufacturers. Therefore, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge, the first thing to consider is the range of use, frequency of work, utilization, rated weight and other factors of the product, and choose a boarding bridge that is suitable for the requirements of the unit. Conduct market research based on the proposed technical parameters. The first condition for selecting a supplier is to consider the manufacturer of the boarding axle, and then the after-sales service capability. As long as it is a fixed boarding bridge with good product quality, excellent performance, and complete equipment,VeronaFactory elevator, it can be chosen at a reasonable price.

The hydraulic system of the hydraulic boarding bridge has stable performance, high quality, low maintenance rate, and is sturdy and durable.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Marketing Department.The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

For the safety performance of high-altitude work platforms, it is necessary to have production technology, scientific processes, and strict management to ensure production. When in use, people, the environment, and machines are the three major links of high-altitude operations, and safety is the basic condition to ensure the smooth progress of high-altitude operations. In the following text, Jiuyi briefly describes the precautions for using high-altitude operation platforms: high-altitude operators must hold a health certificate. Individuals with mental illness, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame,Verona10 meter self-propelled elevator, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).


VeronaFor elevator construction sitesAppearance processing work



Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards,Verona12 meter elevator, remove the motor shaft key.

total cost.The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder the faster the lifting speed.

Fixed elevators are a type of transportation equipment that directly lifts and unloads goods from the ground. They are mostly used for goods transportation between height differences in production lines, material loading and unloading, component lifting during large-scale equipment assembly, fixed three-dimensional parking, and other places. So what is the new price for fixed elevators?

1: The rust on the spiral elevator is caused by some manufacturers' materials not being stainless steel. If rust is not severe, sandpaper can be used to polish and remove the rust. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Verona.Three column aluminum alloy elevator: Three sets of masts support the synchronous lifting of the working platform, and the support structure is the same as that of a single masted platform, with super large load capacity and work stability. The overall lifting guardrail device has good strength and greatly reduces the height of the entire machine during transportation. It is very convenient for loading and unloading and can be assembled or disassembled in one lift.

In addition, it is strictly prohibited to use hammers or other tools during installation to prevent excessive axial or radial force from damaging bearings or gears. Be sure to tighten the installation bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.