FreihannesPicture of oil immersed transformer disassemblyStorage method in the environment

announcer:hp122HP117294921 release time:2024-08-26 09:28:47

generally

Due to poor sealing, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.

Freihannes.Transformer inspection nose sniffing method

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

.Method and process of taking oil sample of power transformer

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

In the electric field of the winding to the yoke there must be a strong line breaking component, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.


FreihannesPicture of oil immersed transformer disassemblyStorage method in the environment



The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity,FreihannesPrice of oil immersed transformer, while oil transformer has better load working capacity.

The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

property right.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.


FreihannesPicture of oil immersed transformer disassemblyStorage method in the environment



& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

Home page recommendation.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain,FreihannesSubstation transformer, snow, wind and sand.

Two point grounding device of iron core caused by residual welding scar;

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.

Freihannes.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out,FreihannesDistribution transformer gear, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.