LodzElectric scissor type lifting platformIntroduction of the use opening situation

announcer:hp935HP175192871 release time:2024-08-24 17:06:19

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.

Lodz.Construction electric elevators should be equipped with emergency stop switches and comply with regulatory requirements.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

.Construction electric elevators outside the lightning protection range

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, and standard sections and other components with severe wear and deformation should be replaced.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.


LodzElectric scissor type lifting platformIntroduction of the use opening situation



During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Pole

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean,LodzElectric elevator cargo elevator, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Latest consultation.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


LodzElectric scissor type lifting platformIntroduction of the use opening situation



Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Total quality management.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Stop the suspension cage.

The hydraulic oil forms a certain pressure by the vane pump,LodzElectric wire rope elevator, explosion-proof electromagnetic directional valve and enters the lower end of the hydraulic cylinder through an oil filter, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

Lodz.The counterweight guide rail should meet the specification requirements.

When the landing door is closed, the full width of the lifting passage opening should be covered.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.