Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure,GiovillanosPrice of 1250kva dry type transformer, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

Giovillanos.The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

.Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack,GiovillanosTransformer power transmission and ignition, and the lifting point shall be on the common earrings or bolts. If necessary the human resources traction belt shall be used as a guide.

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.


GiovillanosDistribution transformer installationType code introduction



Dry type transformer manufacturer

The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;

Manufacturing process and steps of dry-type transformer

investment.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

In specific daily life oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally,GiovillanosHigh voltage bushing of oil immersed transformer, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.


GiovillanosDistribution transformer installationType code introduction



It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

Installation requirements.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, According to Ohm's law, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

Manufacturing process and steps of dry-type transformer