ChifengTwo ton hydraulic lifting platformIndustry price fluctuations

announcer:hp530HP141750488 release time:2024-08-23 16:24:12

The installation personnel should confirm and count the equipment details, confirm that there are no omissions in the shipped equipment details, check if the tools are complete, they should be placed in the middle of the platform as much as possible. The weight of the goods should be within the standard load range of the equipment and the volume of the goods should not exceed the platform size of the equipment. Otherwise, materials and lifting platforms may be injured and dangerous accidents may occur. High priced and various specifications of elevator manufacturers provide timely supply, with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!

Chifeng.Generally speaking, for situations with large lifting loads and small lifting heights, a lifting mechanism should be selected. For situations with small loads but large lifting heights,ChifengSelf hydraulic lifting platform, a lifting mechanism should be selected. According to the initial structure of the jacking, in order to meet the stability requirements, the size and lifting type of the oil cylinder are increased, and in order to achieve the same effective area as the jacking force, the oil cylinder is added. If the latter is larger,ChifengFixed hydraulic lifting platform, a lifting mechanism should be selected.

Emergency descent device: When a power driven chain elevator loses power there should be a device to make the workbench emergency descend.

.After the pre installation is completed, the pre installed equipment should be fixed, and the positions of cables, oil pipes, and components such as the pre installed frame should be confirmed to be correct before reinforcement work can be carried out. Reinforcement requires welding or screws, and the hydraulic cargo elevator after reinforcement has robustness and safety.

The development of elevators is at its peak, as many manufacturers have chosen more multi-story buildings to fully utilize the site, so they also need a device to facilitate the improvement of goods.

When using an electric mobile scissor lifting platform outdoors, if the wind force exceeds level 5, please stop using it; When the lifting height exceeds 10 meters, and the support legs should be reinforced for protection and stability to avoid safety accidents caused by excessive swinging of the electric lifting platform


ChifengTwo ton hydraulic lifting platformIndustry price fluctuations



The lifting platform is a multifunctional heavy loading and unloading mechanical equipment, which can be divided into fixed and mobile, guide rail and curved arm types. Fixed types include scissor elevators, chain elevators,ChifengFixed electric hydraulic lifting platform, loading and unloading platforms, and attached electric construction platforms.

Lift and move horizontally with load to return to the loading position. For the transportation time of each item, such repeated cycles are called cycles.

The hydraulic oil used in the system has the same brand, and the oil temperature is between 45~80 ℃. Use a large flow rate to remove impurities from the system as much as possible. The hydraulic system needs to be cleaned repeatedly three times or more, and after each cleaning, the system should be drained while the oil is hot. After cleaning, clean the filter and add new oil after using a new filter element.

Range.Regularly inspect the hydraulic lifting equipment of the upper and lower materials to ensure the safety of the rail type elevator and the safety of the material supply to the rail type lifting platform.

To consider its capacity, generally mobile equipment takes 2-3 times the high flow rate of pump Z, and fixed equipment takes 3-4 times.

Reason: The lowering valve is not tightly closed. Cleaning method: Check if the lowering valve is powered on. If there is no power supply, clear the malfunction of the lowering valve itself or replace the lowering valve. It is necessary to keep the valve of the lowering valve clean and flexible.


ChifengTwo ton hydraulic lifting platformIndustry price fluctuations



Each box, distribution box, etc. should be kept clean and promptly cleaned of dust on electrical equipment.

Meticulous workmanship.When using an electric mobile scissor lifting platform outdoors, if the wind force exceeds level 5, please stop using it; When the lifting height exceeds 10 meters, the wind ropes at the four corners of the hydraulic lift platform should be tightened and fixed, and the support legs should be reinforced for protection and stability to avoid safety accidents caused by excessive swinging of the electric lifting platform

The above are common situations, it is easy for hydraulic cargo elevator manufacturers to cause this problem.

The hydraulic pump produces noise. When the hydraulic elevator rises, the hydraulic pump runs at high speed. If there is a problem with the gears or bearings of the hydraulic pump, which causes periodic changes in the hydraulic system pressure, it will also cause resonance in the hydraulic system and generate noise.

When placing materials on the platform, they should be placed in the middle of the platform as much as possible. The weight of the goods should be within the standard load range of the equipment, and the volume of the goods should not exceed the platform size of the equipment. Otherwise, materials and lifting platforms may be injured and dangerous accidents may occur. High priced and various specifications of elevator manufacturers provide timely supply with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!