PumacilGuide rail hydraulic lifting platformIndustrial Digital Development System

announcer:hp695HP135175170 release time:2024-08-23 09:43:53

The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time when it rises to a designated position. Of course, this problem is definitely abnormal. So how can we solve it? The first step is to identify the cause. Below, the editor summarizes the ultimate solution.

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

Pumacil.The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat,PumacilElectric lifting platform, and in severe cases, the winding will be burned out.

High altitude work is now also very common, and elevators are also highly demanded by the market. Many high-rise transportation tasks are completed by elevators, with high efficiency and reassuring safety. However, attention should also be paid to the installation of the elevator, otherwise there may be problems, pay attention to heat dissipation.

What are the pressures on lifting platforms? The movement of lifting platforms has always been a concern for us. Our usage scenarios are uncertain, and most of them are part-time workers. Therefore, in order to better attract customers, we are constantly researching mobile lifting platforms to meet different needs. However, for some large logistics or enterprise processing plants, we are still accustomed to using fixed elevators, which can meet the needs of many customers, which is also the use of lifting platforms in China in recent years.

Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated. For a long time, the manufacturer of scissors lift has never changed hands to avoid price difference, and the price is 20% higher than the market value! More than one ton is more expensive!


PumacilGuide rail hydraulic lifting platformIndustrial Digital Development System



Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.

When the lowering valve is open and the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity,PumacilElectric hydraulic lifting platform, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly.

The power unit adjustment, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, which can be adjusted to increase or decrease the hydraulic oil flow rate of the oil cylinder. We can adjust the motor speed or the electro-hydraulic proportional valve to adjust the hydraulic oil flow rate; What factors will affect the lifting speed of hydraulic elevators? The longer the hydraulic oil pipe, the longer the lifting time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit, the size of the oil pipeline can also be adjusted, and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.

Job description.When using the distribution box, the electric leakage switch meets the requirements for construction elevators. If the fixed elevator installed is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

Every month, it should be ensured to add butter twice to the transmission position where the grease nipple is located. For areas where butter cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.


PumacilGuide rail hydraulic lifting platformIndustrial Digital Development System



After entering winter, elevators are prone to some small problems and malfunctions which requires users to perform seasonal maintenance and upkeep on the elevator. Below, this is the first thing to understand. There are two ways to understand it: first the editor will briefly introduce the winter maintenance precautions and key points of the elevator.

Management Department.Familiarity with the usage process and without a doubt carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.

Emergency bolts not tightened; The solution is to tighten the emergency valve.

High altitude work requires the use of tool bags, efficiency, and usable area of electric elevators, most high-rise buildings will divide electric elevators into arrays, and make different adjustments and scheduling based on the usage mode of different floors at different times.

Before installing the elevator bearings, do not open the packaging too early. This can easily lead to premature bearing contamination, which can lead to premature bearing damage. Additionally, ensure that the installation environment is clean and do not bring iron filings, dust, and other objects into the bearings. Even small dust particles can cause premature bearing damage, Prolonged use can also affect the running in between bearings, leading to a decrease in the lifespan of the elevator.

Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.