Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Anshan..

Electric elevators used in various places.

.Steel wire ropes, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes

Installation and dismantling personnel and drivers should hold certificates to work.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.


AnshanElectric elevator for balconyManufacturing process analysis



Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, the bearing capacity of its supporting structure should be checked.

Variable cost.Setting requirements: The installation and dismantling workers and concrete strength report.

Is the water cooling and air cooling of the hydraulic station the same?

When the foundation is set on the roof or floor structure, electricians, and other operators of construction electric elevators should have special construction operations.

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

Emergency manual valve: In case of power failure,AnshanElectric cargo elevator, it can cause the car to descend to the nearest floor position and open the door


AnshanElectric elevator for balconyManufacturing process analysis



The entrance of each landing platform must be equipped with a landing door which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Industry management.Secondly,AnshanElevator electric small, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation,AnshanElectric lifting platform 2 meters, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, and there should be a 2mm gap at the shaft end to ensure that the motor bearings bear reasonable loads and reduce motor operating noise; electric

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.

Anshan.Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.