IrelandElectric bed elevatorhow to use

announcer:hp935HP175192871 release time:2023-08-03 15:11:23

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Work is essential, and the main protective accessories include safety belts, guardrails,IrelandElectric fixed elevator, protective covers, platforms and stairs, etc.

Ireland.Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

Use floor doors and cage door devices on construction sites where conditions permit.

.To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.


IrelandElectric bed elevatorhow to use



When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

There is a certain itinerary.

Protective measures should comply with regulatory requirements.

Product line.Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, stable operation large stroke, low noise, accurate positioning,IrelandElectric cargo elevator, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.


IrelandElectric bed elevatorhow to use



To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back,IrelandElectric high-altitude elevator, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, the safety distance can be 0.40m.

Mobile electric elevators are divided into: four wheel mobile lifting platform, two wheel traction lifting platform, car modified lifting platform, manual lifting platform manual lifting platform, and AC/DC dual purpose lifting platform

Use floor doors and cage door devices on construction sites where conditions permit.

Ireland.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Acceptance: Concrete strength grade C30, strength testing report.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.