After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Analysis of common faults of oil immersed transformer:

Debray birhan.During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.

.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat,Debray birhanTransformer distribution equipment, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.


Debray birhanTransformer powerManagement System Research



The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, and the phasor of the phase voltage of the secondary side is used as the second hand.

The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, loosening ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things,Debray birhanHigh voltage oil immersed transformer, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

Common problems of tap changer of power transformer

Workshop cost.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil,Debray birhanPower transformer design, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb,

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.


Debray birhanTransformer powerManagement System Research



Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.

Inspection standard.Before no-load impulse closing, a static electrical equipment and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Dry type transformer, is used to change the AC current (current) of a certain standard value into another or several types of working voltage (current) with the same frequency and different standard values. According to the supervision sampling inspection data of the third quarter of last year released by AQSIQ, among the 29 kinds of dry-type transformer commodities manufactured by 29 manufacturers in 12 provinces and municipal districts across the country, 6 kinds of commodities were found to be inconsistent with the provisions of relevant specifications, with a compliance rate of 80%& ldquo; This result mostly shows the quality level of China's dry-type transformer industry at the present stage.

Dry type transformer company

Debray birhan.For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

Sound in case of phase failure