AnguoBoarding axle brandHow to test for fatigue

announcer:hp161HP196399230 release time:2024-07-29 12:39:40

When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

As we all know

Anguo.There are the following: (1) The brake of the elevator should be regularly inspected to see if its clearance is appropriate, as well as some other aspects, on the friction surface of the brake, and if any, it should be cleaned in a timely manner. (2) For the part of the moving boarding bridge, it should be carried out in accordance with the specified requirements, and it should be comprehensive and sufficient without any omissions. However, the amount of oil should not be too much, as too much can also cause problems.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope,AnguoBoarding bridge platform, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

.The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

Tighten the manual valve to close it.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.


AnguoBoarding axle brandHow to test for fatigue



After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

The above content mainly shares the importance analysis of regular maintenance of mobile boarding bridges with everyone, hoping that everyone can take it seriously and not overlook it.

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

Fair price.It is strictly prohibited to apply excessive pile loads around the foundation pit.

During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform and there is basically no change to the building structure.


AnguoBoarding axle brandHow to test for fatigue



Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today,AnguoBoarding axle brand, I will take you to understand!

Installation material list.There are three movable boards on both sides of the air conditioning board,AnguoWarehouse boarding bridge, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

Solid rubber tires have no inflatable inner tubes and can move and work on various complex surfaces without worrying about puncturing the inner tubes, making them less prone to damage. They have stronger adaptability to the environment. Solid rubber tires have higher load-bearing capacity than ordinary pneumatic rubber tires of the same model, are more wear-resistant, have a longer service life, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Anguo.The pressure on the axle will reduce the service life of the boarding axle.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.