RizerDetailed structural drawing of dry-type transformerSkills

announcer:hp122HP117294921 release time:2024-07-16 10:25:47

it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

Rizer.Several detection methods for installing transformer

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

.In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

& ldquo; YN, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).


RizerDetailed structural drawing of dry-type transformerSkills



When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

If the above provisions are not met, the problem of dryness shall be solved. Generally,RizerOverload capacity of oil immersed transformer,RizerMiniature power transformer, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

Promise and keep promise.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

In terms of the place of use, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

For example, in the 1970s, the radio programs applied by every family in the countryside had a ground wire and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.


RizerDetailed structural drawing of dry-type transformerSkills



Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

how.In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection,RizerGrid transformer, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

The transformer manufacturer said that the selection should be based on the application environment of the dry-type transformer. For the extremely extreme environment, the dry-type transformer should be poured with epoxy resin glue. Because this kind of environment does not need to heat the dry-type transformer, it can operate immediately. However, for the general application environment, the class H dry-type transformer can be used.

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, tunnel construction, chemical enterprises and factories.

Rizer.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

High voltage fuse of transformer breaks one phase;

Under normal conditions the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.