Xie DezeSelf propelled electric elevatorWhat to pay attention to when professional

announcer:hp935HP175192871 release time:2024-07-16 10:19:31

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out,Xie DezePure electric curved arm elevator, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats etc.

Xie Deze.The installation position of the lower limit switch. The installation position of the lower limit switch should ensure that the contact plate triggers the switch when the rated load of the suspension cage decreases, causing the suspension cage to stop. At this time, the contact plate should also be close to the triggering of the lower limit switch

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage an intermediate stage, a T-shaped stage, or a hall.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.


Xie DezeSelf propelled electric elevatorWhat to pay attention to when professional



It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform,Xie DezeElectric mobile elevator, and high load-bearing capacity, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip insulation, and safety features. Please rest assured to use.

A lifting platform with specifications ranging in height from 1 meter to 20 meters.

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

wholesaler.Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.


Xie DezeSelf propelled electric elevatorWhat to pay attention to when professional



Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends,Xie DezeElectric three wheel elevator, it can automatically cut off the oil circuit and stop descent

Quality inspection report.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

In addition, when adding hydraulic oil, it is necessary to ensure the quality of the hydraulic oil, as some hydraulic oil manufacturers will choose hydraulic oil with poor quality. Hydraulic oil such as hydraulic lifting platforms not only cannot have any effect on folding arm elevators, but also affects the working efficiency of folding arm electric elevators due to deterioration issues.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width