Nakan panomScb13 dry type transformer with secondary energy efficiencyAir exposure rate

announcer:hp122HP117294921 release time:2024-07-15 11:55:03

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

Oil immersed transformer operation

Nakan panom.The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking,Nakan panomModel of oil immersed transformer,Nakan panomHow much is a 200 KVA box transformer, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, which can be inspected according to the visual inspection method. Therefore etching and turbidity, visual inspection is one of the common methods of equipment inspection.

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

.(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m,Nakan panomSCB dry type transformer model, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.


Nakan panomScb13 dry type transformer with secondary energy efficiencyAir exposure rate



The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.

How much is the power transformer

Safety production.Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

Protective measures for damping of dry-type transformer


Nakan panomScb13 dry type transformer with secondary energy efficiencyAir exposure rate



During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

Good quality.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.

Right, as & ldquo; Great Lars car & rdquo; After replacing one 255kva small transformer, the utilization rate is close, but the main parameters of the two transformers are evaluated as shown in Table 1. Table 1 evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Nakan panom.Falling foreign matters and piercing

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Connection group structure of dry-type transformer