ProskovHydraulic fixed boarding bridgeOn-site management method of workshop

announcer:hp258HP138990173 release time:2024-07-15 09:29:43

  2. The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure. During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms.

Precautions for safe use of fixed hydraulic boarding bridges When operating the machine, it is necessary to operate it in a safe manner. Unfamiliar personnel should not do so. During the operation, do not stand bystanders around. Be sure to carry the load according to the rated load, and do not overload or deviate. The rated load of the fixed hydraulic boarding bridge specified by the manufacturer is the total weight of the loaded goods and forklifts, not the weight of the goods alone. This is something that customers and friends should know. If there is detachment or deformation of the boarding bridge, please do not use it to avoid serious accidents. The boarding bridge is mainly an auxiliary device for loading and unloading goods, which greatly improves the loading and unloading power (referring to the amount of work done by objects in a unit of time), and is something that logistics companies (Company) cannot do less. If the power of the boarding bridge operation (zuò yì) is to be durable, no problems can appear during the operation. Perhaps the problems can be dealt with in a timely manner. Regarding identifying the cause of the hydraulic system problem of the boarding bridge, It is beneficial for us to use the boarding bridge correctly and provide homework

Proskov.The hydraulic boarding bridge is mainly made of anti slip thick steel plates during the production and manufacturing process, and all equipment can provide good anti slip characteristics to a certain level in operation and application. The hydraulic press loading bridge is a specialized auxiliary equipment that maintains rapid loading and unloading of goods. Its height adjustment function creates a bridge between the large truck and the cargo platform in the warehouse. Transport vehicles such as electric forklifts can immediately enter the large truck to carry out mass loading and unloading of goods, also known as the loading and unloading service platform. That way, the device can loosen the return valve button during the lowering process, thereby reducing the weight of the device.

A one line boarding bridge suitable for special heavy-duty vehicles in special situations. If all the wheels of any multi axle vehicle are rigidly suspended on the frame of the trailer, it cannot be guaranteed that all the wheels will be suspended from the ground at the same time when driving on harsh roads, resulting in accidents such as wheel suspension and serious vehicle body accidents. It seriously affects the driving smoothness and handling stability of the vehicle. The use of a one line, two axle boarding bridge can ensure that all wheels have good contact with the road surface when driving on harsh road conditions thereby reducing accidents such as vehicle body and improving vehicle driving smoothness and handling stability. The self steering boarding bridge is designed based on the principle of adjusting and stabilizing steering according to different loads. The hydraulic boarding axle beam and the steering pin fluctuation pressure bearing are connected together. When the vehicle is traveling in a straight line, the mass of the vehicle itself causes the upper and lower wavy pressure plates to mesh closely with each other, thereby maintaining the straight running state of the wheels. Whenever a semi trailer turns, the wavy tooth surface of the pressure bearing is misaligned, raising the axle beam and causing the wheels to automatically turn. The frictional resistance between the two pressure blocks also needs to undergo corresponding changes depending on the load on the boarding bridge. In addition, according to different loads the steering angle limiter can automatically increase the steering angle. At the same time, the steering tie rod also causes the instantaneous center of rotation of two wheels to coincide. The anti slip device of the boarding bridge is welded with steel plates, which can effectively achieve anti slip function, safe and reliable. Anti collision blocks can effectively protect buildings and boarding bridges from damage. It is made of highly resistant reinforced rubber. The four outer corners of the anti-collision block are all arc-shaped and all bolt holes are deeply embedded inside. Bolt hole size is Ф The anchor bolt mounting bridge for M20 assembly is composed of a mechanical system, a hydraulic system, and an electrical system. The platform and chassis form a mechanical system. Elevating the platform to; U” Shaped steel as the skeleton, with light self weight and large bearing capacity; The countertop is made of anti slip patterned steel plates and has a high load-bearing capacity; The countertop is made of anti slip patterned steel plates, and can withstand a speed of 10 kilometers/hour when the forklift is fully loaded without bending, improving work reliability.

. 

The lip plate is connected to the platform using a full length shaft, which has high strength and good reliability.

Equipment environment, selecting appropriate equipment, can achieve very good application effect. It is a specialized auxiliary equipment for completing the rapid loading and unloading of goods. Horizontal load problems are often encountered in mobile lifting channels and vehicular lifting channels. How do we understand the additional load on fixed hydraulic boarding bridges? The additional load refers to the load that the lifting channel is subjected to under normal operating conditions under non recurring actions.


ProskovHydraulic fixed boarding bridgeOn-site management method of workshop



Using a hand operated hydraulic pump as power, the height adjustment of the boarding bridge can be achieved without the need for external power supply.

The problem of sealing ring damage is common in almost all hydraulic systems, such as oil cylinders. It may be due to poor quality of the sealing ring itself, insufficient compression of the sealing ring, etc. When the sealing ring is lifted and lowered for a long time, it causes varying degrees of wear and tear on the sealing ring. This is a common cause, leading to gaps in the sealing performance of the sealing ring, resulting in oil leakage. At this time, only the damaged sealing ring needs to be found, Just replace it with a new one.

The following is a brief introduction to the storage of hydraulic oil in fixed hydraulic boarding bridges for a wide range of users: when stopping the hydraulic oil drum and filling, it is necessary to achieve three passes and pass when receiving oil; Filtering during barrel rotation: When refueling the equipment, it is too cold to ensure the cleanliness of the bucket mouth, oil injection port, oil barrel, etc., to prevent impurities from entering the oil port and forming hydraulic oil purification.

Energy costs.Adopting imported integrated modular hydraulic station, with good sealing performance and long service life.

Chinese manufacturer of boarding bridges, dedicated to mobile lifting (sh ē Ten series of hydraulic lifting platform products, including platform self-propelled aerial work platform, fixed lifting platform, TTW guide type cargo lift, aluminum alloy (melting point 660 ℃) lifting platform, jacketed lifting platform, folding arm lifting platform, car mounted lifting platform, lifting stage, boarding bridge, etc, All properties owned by the company

Set up a new oil warehouse testing system: Before entering the hydraulic lifting channel, hydraulic oil should be stopped from sampling and testing. Unqualified oil should be stopped from entering the warehouse, and the quality of the warehouse should be strictly controlled. A special hydraulic oil protection system should be set up: the oil should be stored and stored according to the brand when entering the warehouse, and disorderly storage should be prohibited. It should be stored in a dry and ventilated place in the open air for daily rain and rain, It is necessary to fill out labels in a timely manner and conduct regular sampling and testing: In order to ensure the quality of the oil products leaving the warehouse, it is necessary to conduct seven regular inspections of the hydraulic oil inventory. Any unqualified oil products found after testing should be disposed of in a timely manner and containers should not be used for regular cleaning. Containers containing hydraulic oil should be cleaned regularly, and special personnel should be assigned to handle some of the more precise parts in the fixed hydraulic boarding bridge. Although mechanical hydraulic drive is labor-saving and convenient, it is also complex and damaged. The primary reason for the fixed hydraulic boarding bridge is that its operating principle and structural characteristics are not clear, and its preventive maintenance is not very clear. The fixed boarding bridge is for convenient repair and maintenance. It will not affect the normal operation of the equipment.


ProskovHydraulic fixed boarding bridgeOn-site management method of workshop



Precautions for safe use of fixed hydraulic boarding bridges When operating the machine, it is necessary to operate it in a safe manner. Unfamiliar personnel should not do so. During the operation, do not stand bystanders around. Be sure to carry the load according to the rated load, and do not overload or deviate. The rated load of the fixed hydraulic boarding bridge specified by the manufacturer is the total weight of the loaded goods and forklifts, not the weight of the goods alone. This is something that customers and friends should know. If there is detachment or deformation of the boarding bridge, please do not use it to avoid serious accidents. The boarding bridge is mainly an auxiliary device for loading and unloading goods, which greatly improves the loading and unloading power (referring to the amount of work done by objects in a unit of time), and is something that logistics companies (Company) cannot do less. If the power of the boarding bridge operation (zuò yì) is to be durable, It is beneficial for us to use the boarding bridge correctly and provide homework

Honest service.The fixed hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, and only one person can work to achieve fast loading and unloading of goods. Boarding bridges reduces a large amount of labor for enterprises, improves work efficiency,ProskovFixed boarding bridge, and achieves greater economic benefits.

Firstly, as the fixed hydraulic boarding bridge is used to complete the rapid loading and unloading of goods through height adjustment plates, there are certain strict requirements for the quality and material selection of height adjustment plates to avoid the occurrence of defective materials, which will result in unexpected loss of performance in the application process.

Function: Convenient unloading, strong stability, and unloading platforms: anti slip device: This device is welded from steel plates lifting platforms, which can effectively achieve anti slip function and is safe and reliable.

Proskov.  2. The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure. During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range which can meet the installation and use of most loading and unloading platforms.

Product features: Fully hydraulic drive, easy to operate and reliable to operate.

The rear folding transition plate and forklift traction hook can easily move the boarding bridge. A layer of toothed anti-skid plates or checkered plates is laid on top of the bridge body. The mesh is twisted and hollow, which not only improves the reliability of work, but also prevents the accumulation of grease, dirt, rainwater, and ice and snow. This equipment is particularly suitable for explosion-proof and flammable places, with manual hydraulic power, without generating sparks and no worries. The power can be configured as: manual hand pump power. Electric power. Ensure that the oil cylinder is processed by iron cutting and rolling. Several maintenance and upkeep items for the fixed boarding bridge: each rotating shaft pin should be maintained regularly to reduce wear and enhance flexibility in use; The use of hydraulic oil should follow the specified model, usually 46 # or 68 #, which should be changed every six months and the oil tank should be cleaned; All rotating parts should be regularly cleaned, and the market should clean the dust, sand, iron blocks, etc. on them. During maintenance, do not use water to clean them directly; Regularly inspect all parts for signs of detachment,ProskovHydraulic fixed boarding bridge, or looseness, and promptly handle them to avoid breakage during loading; If there is a large area of paint peeling off the ground it should also not be re applied to avoid rust and corrosion. Hydraulic boarding bridges have become an essential loading and unloading equipment in logistics warehousing. What precautions should be taken when using the equipment? Next, the boarding bridge manufacturer - editor will provide a detailed introduction (xiá ng xì)