The input and output three-phase power lines shall be connected to phase a,East of ahmepur500 KVA oil immersed transformer, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

How to reduce the failure of dry-type transformer?

East of ahmepur.If the input of dry-type transformer is an alternating switching power supply, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.

Falling foreign matters and piercing

.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

The switching power supply lacks one phase of power;

Protective measures for damping of dry-type transformer


East of ahmepurThree phase transformer 380V to 208vFaults and elimination methods in daily work



When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

There is a magnetic induction line crossing in the transformer core, which will cause induced electromotive force on the plan with the magnetic induction line. Because this electric flow creates a closed loop to generate an electric field and forms a vortex it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.

Method and process of taking oil sample of power transformer

Trustworthy.(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

Power transformer factory

Power transformers are used in all walks of life


East of ahmepurThree phase transformer 380V to 208vFaults and elimination methods in daily work



(IV) the transformer on the column shall be stable and firm and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Product line.The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times,East of ahmepurTelephone number of dry-type transformer manufacturer, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

Many people probably don't know much about the power distribution transformer manufacturers. In fact,East of ahmepurHow much is a box transformer, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, i.e. insulation spacing.

East of ahmepur.The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.