Migdalha ` emeqPower Bureau transformerBring changes to the domestic market

announcer:hp122HP117294921 release time:2024-07-02 18:38:24

Analysis of common faults of oil immersed transformer:

Oil leakage at electric welding position

Migdalha ` emeq.The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, check and replace the silica gel of the breathing mask, etc.

In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

.Wiring mode of dry-type transformer:

When the transformer is put into operation, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.


Migdalha ` emeqPower Bureau transformerBring changes to the domestic market



Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by 100kW motor so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Common problems of tap changer of power transformer

Trustworthy.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage,Migdalha ` emeqPrinciple of power transformer, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.


Migdalha ` emeqPower Bureau transformerBring changes to the domestic market



Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

Total quality assurance.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

Two point grounding device of iron core caused by residual welding scar;

Loose core screw

Migdalha ` emeq.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance,Migdalha ` emeqInsulation grade of power transformer, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified,Migdalha ` emeqQuotation of 315 KVA oil type transformer, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?