WarsawElectric small mobile elevatorSeveral items that should be paid attention to during installation

announcer:hp935HP175192871 release time:2024-06-29 15:55:56

The verticality of the guide rail frame should meet the requirements of the specifications.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Warsaw.If the set screw is loose, be sure to pin it tightly to prevent accidents caused by the shaft pin falling off. Hydraulic oil should be kept clean and replaced every 6 months.

The verticality of the guide rail frame should meet the requirements of the specifications.

.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications record the inspection results, and report any problems found to the user unit.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, and standard sections and other components with severe wear and deformation should be replaced.

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference,WarsawExternal wall electric elevator, ensuring the safety of the cast members.


WarsawElectric small mobile elevatorSeveral items that should be paid attention to during installation



For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention,WarsawSmall electric automatic elevator, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

The up travel (limit) switch should be of the automatic reset type.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Installation materials.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

The quality of the standard section should comply with the product manual and specification requirements.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door


WarsawElectric small mobile elevatorSeveral items that should be paid attention to during installation



Electric elevators used in various places.

Product range.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Degrees, m/s.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Warsaw.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.