Larosh on the Yonghe River3 meter electric elevatorProportion of synergistic varieties

announcer:hp935HP175192871 release time:2024-06-28 20:10:16

when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Larosh on the Yonghe River.The use of fully autonomous electric elevators can create more benefits and ensure safety in all aspects.

The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter,Larosh on the Yonghe RiverElectric chain elevator, explosion-proof electromagnetic directional valve,Larosh on the Yonghe RiverElectric elevator for exterior wall decoration, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

.Before operating the construction electric elevator, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets,Larosh on the Yonghe RiverElectric elevator, soft scenery, etc.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.


Larosh on the Yonghe River3 meter electric elevatorProportion of synergistic varieties



For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

The cargo is 0.5m.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.

Discount.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.


Larosh on the Yonghe River3 meter electric elevatorProportion of synergistic varieties



Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Honesty and mutual benefit.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

The occurrence of.

When the landing door is closed, the full width of the lifting passage opening should be covered.

Larosh on the Yonghe River.Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

During the use period the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.